Similar Projects
Last Updated | 05/24/2023 04:05 PM |
Project Title | 2023 Clarifier Drive Replacement Project |
Physical Address | View project details and contacts |
City, State (County) | Cortez, CO 81321 (Montezuma County) |
Category(s) | Heavy and Highway, Sewer and Water |
Sub-Category(s) | Sewage Treatment Plant, Site Development |
Contracting Method | Competitive Bids |
Project Status | Bidding, Construction start expected June 2023 |
Bids Due | View project details and contacts |
Estimated Value | $250,000 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Reference Number 0000317668 The project includes removal and disposal of existing drive unit, and installation of a new drive unit on a 110 diameter solid contact clarifier at the City of Cortez Water Treatment Plant, 27999 Road N, Dolores, CO 81323. The existing model that needs to be replaced is a (WesTech DS 43 Dual Shaft Drive, Model No. DV8026). Drive unit details: Rake drive size 2HP, Rake speed .026RPM, Turbine Drive size 7.5HP, Turbine speed 6.65 - 1.33 RPM, Duty Rated Torque 50,000 (ft/lbs), Torque Control settings (ft/lbs) Continuous: 30,000 (60%) Alarm: 40,000 (80%) Motor Cutout 50,000 (100%). All Work is located the Cortez Water Treatment Plant. Questions are submitted online No Contact Information Vickie Haddix 970-565-7320 ext. 3200 vhaddix@cortezco.gov |
||||||||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |