Similar Projects
Westerra Homes Phases C & D
Infrastructure
Conception
Sequim, WA 98382

Site work for a golf course
Infrastructure
Conception
Longview, WA 98632

Little Goose DC System and LV Switchgear Upgrades
Renovation, Infrastructure
Design
$25,000,000 CJ est. value
Starbuck, WA 99359

Fruit Valley Modernization
Build-out, Renovation, Infrastructure
Design
$4,754,309 CJ est. value
Vancouver, WA 98660

FY22 Neah Bay Dredging
Infrastructure
Bidding
$5,000,000 CJ est. value
Neah Bay, WA 98357

RFQ D/B - I-405, Northeast 85th Street Interchange and Inline BRT Station Project
Infrastructure
Bidding
$210,000,000 CJ est. value
Kirkland, WA 98033

RFQ Construction Manager - General Contractor/construction Manager (Gc/cm) Asotin County Justice Complex
New Construction, Infrastructure - 53,000 SF
Sub-Bidding
$11,400,000 CJ est. value
Clarkston, WA 99403

Prosser Memorial Health Replacement Hospital - BP-09a Roofing, BP-09b Sheet Metal/Flashing, BP-10 Metal Panel
Demolition, New Construction, Infrastructure
Sub-Bidding
$423,500 CJ est. value
Prosser, WA 99350

Lummi Nation Seapond Dike Repair and Armoring
Infrastructure
Post-Bid
Bellingham, WA

Lummi Nation Seapond Dike Repair and Armoring
Infrastructure
Post-Bid
Bellingham, WA

"N" Street Outfall Improvement Project
Infrastructure
Results
$260,000 to $280,000 est. value
Port Angeles, WA 09372

Repair Slumps on Hurricane Ridge and Obstruction Point Road
Alteration
Results
$500,000 to $1,000,000 est. value
Port Angeles, WA

Rehabilitate Parking Area, Ruby Beach, Olympic National Park
Infrastructure
Construction
$772,030 CJ est. value
Port Angeles, WA 98362

Villagio Mixed-Use Development
New Construction, Infrastructure - 27,940 SF
Pending Verification
$15,000,000 CJ est. value
Vancouver, WA 98662

Curtain Creek Warehouses
New Construction, Infrastructure - 343,720 SF
Pending Verification
$15,000,000 CJ est. value
Vancouver, WA 98662

Last Updated 08/23/2022 01:35 PM
Project Title

2022 Lopez Island Culvert Replacements

Physical Address View project details and contacts
City, State (County) Lopez Island, WA 98261   (San Juan County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $59,000 [brand] Estimate
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

San Juan County is seeking a contractor for the replacement of three storm culverts on Lopez Island, located on Center Road, Fisherman Bay Road, and Mud Bay Road. Please see attached plan set for additional details. Work includes excavation, disposal, pipe laying, backfill, compaction and other work, all in accordance with the Contract Plans, Contract Provisions, and WSDOT Standard Specifications for Road, Bridge, and Municipal Construction, 2022 edition. Contract Time: Five (5) working days; physical completion of work must take place by October 31, 2022. The County is not holding a pre-bid conference for this project. The project sites are open to bidders for inspection. Contract Bond (Payment and Performance Bond): The successful bidder shall provide (an) executed contract bond(s) for the full contract amount, in accordance with RCW 39.08.010. Additional Information: Contact the Public Works Department, by phone at (360) 370-0500 or by email at pubwks@sanjuanco.com, with any questions.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents