Similar Projects
T-396 over East Branch Chillisquaque Creek
Demolition, New Construction, Infrastructure
Conception
$1,345,000 CJ est. value
Mahoning Township, PA 17821

T-396 over East Branch Chillisquaque Creek
Demolition, New Construction, Infrastructure
Conception
$1,345,000 CJ est. value
Mahoning Township, PA 17821

SR 54 Corridor Safety Improvement
Infrastructure
Design
$20,451,180 CJ est. value
Mahoning Township, PA 17821

SR 54 Corridor Safety Improvement
Infrastructure
Design
$20,451,180 CJ est. value
Mahoning Township, PA 17821

Seal Coat Contract
Infrastructure
Bidding
$100,000 CJ est. value
Danville, PA 17821

Seal Coat Contract
Infrastructure
Bidding
$100,000 CJ est. value
Danville, PA 17821

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

23 WHM SGL 211 Railroad Grade Road Phase 1
Infrastructure
Post-Bid

East Buffalo Township Oxford Drive Drainage and Roadway Improvements
Infrastructure
Results
Lewisburg, PA

Fairground Road Park - Phase 1
Renovation, Infrastructure
Results
$525,000 est. value
Lewisburg, PA

Montour County Bridge Maintenance and Repair Project: Sites A, B, C, D & E
Infrastructure
Construction
$243,562 CJ est. value
Danville, PA 17821

Montour County Bridge Maintenance and Repair Project: Sites A, B, C, D & E
Infrastructure
Construction
$243,562 CJ est. value
Danville, PA 17821

Behavioral Health Clinic / Danville
New Construction, Infrastructure - 73,000 SF
Pending Verification
$43,000,000 CJ est. value
Danville, PA 17821

SR 54 Wbl over Mahoning Creek
Infrastructure, Renovation
Conception
$1,100,000 CJ est. value
Danville, PA 17821

T-392 over Mud Run Bridge Removal
Demolition, Infrastructure
Design
$585,000 CJ est. value
Danville, PA 17821

Last Updated 05/05/2023 01:08 PM
Project Title

Cherry Street to Byrd Avenue

Physical Address View project details and contacts
City, State (County) Danville, PA 17821   (Montour County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Bids by Invitation, Competitive Bids
Project Status Contract Award, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $945,436 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Mill, overlay, utility adjustments, pavement markings, and other miscellaneous construction, as indicated on the approved drawings included in the bid package for STATE ROUTE 2008, SECTION 013, in MONTOUR COUNTY, MAHONING TOWNSHIP from the intersection with SR 2010 at segment 0004 offset 0000 to approximately 2.5 miles west of the Montour / Columbia County Line at segment 0050 offset 0500. Project Cost Range: $500,000.00 - $999,999.99 Federal Project Status: PENNDOT Oversight Non-NHS Structure Work: 0.00% Pre-Bid Meeting: None Wage Rates: Yes Prequalification Requirement: Yes State Type of Work: RESURFACING/OVERLAYS 408 Version: 2020-6 PennDOT - Cherry Street to Byrd Avenue *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents