Similar Projects
Renovation and Improvements to Stormwater Pumping Station No.3
Renovation
Bidding
Frederick, MD 21701

GHES Sewage Lift Station Pump and Controller Replacement
New Construction
Bidding
Lexington Park, MD 20653

Operational Superintendent for the Water and Wastewater Treatment Plants
Renovation, Term Contract
Post-Bid
Beltsville, MD 20705

McKeil Point Bermed Infiltration Pond On-Site Sewage System Removal
Infrastructure
Post-Bid
Cambridge, MD

Primary Settling Tanks Nos. 3 & 4 Rehabilitation at the Back River WasteWater Treatment Plant
Results
$15,000,000 to $20,000,000 est. value
Baltimore, MD 21224

Primary Settling Tanks Nos. 3 & 4 Rehabilitation at the Back River WasteWater Treatment Plant
Results
$15,000,000 to $20,000,000 est. value
Baltimore, MD 21224

Route 925B Pump Station Replacement
Renovation
Bidding
La Plata, MD 20646

Windmill Pump Station Replacement
New Construction
Post-Bid
$2,500,000 to $3,500,000 est. value
Easton, MD

Design Build Services for Improvements to Sewer Pump Station 8
Results
$275,000 to $325,000 est. value
Bowie, MD

Locust Grove Sewage Pumping Station Replacement
Results
$8,000,000 to $12,000,000 est. value
La Vale, Locust Grove, MD 21502

Central Correctional Facility Collection System Upgrade
Results
Sykesville, MD 21784

Construction of Pump Stations 2, 3, 4, and 5 Electrical Upgrades
Results
Berlin, MD 21811

Replace 40 Inoperative Sump Pumps
Results
Less than $100,000 est. value
Cumberland, MD 21502

Penwood Terrace Pumping Station Improvements
Results
$2,500,001 to $5,000,000 est. value
Edgemere, MD 21219

High Expansion Foam Install with Pumphouse
New Construction
Results
$1,000,000 to $5,000,000 est. value
Middle River, MD

Last Updated 03/30/2022 04:27 PM
Project Title

Ballenger Mckinney Influent Pumping Station Modifications

Physical Address View project details and contacts
City, State (County) Frederick, MD 21704   (Frederick County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Work under this contract includes all labor, equipment and materials necessary for a low flow pump within the Ballenger-McKinney Wastewater Treatment Plant (WWTP) Influent Pumping Station. The project shall include a pump, piping, valves, instrumentation, controls, SCADA, variable frequency drive, electrical, structural improvements in wet well, and misc. structural work.

Details

Lift and Pump Stations, Renovation.
Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents