Similar Projects
Raritan River Bridge Replacement Construction Project Construction Contract No. 2
Renovation
Post-Bid

Design and Fabrication of Four (4) Extrudeck Series Aluminum Toll Canopies or Approved Equal at the Commodore Barry Bridge Facility
Results
Camden, NJ

Bridge Repairs and Resurfacing - Milepost 0 to 92 and the Pearl Harbor Memorial Turnpike Extension (2021)
Results

Replacement of Bicycle Path Pedestrian Bridge
Results
Gloucester Township, NJ

Signature Bridge Preventive Maintenance Contract 2019-1
Results
$20,000,001 to $50,000,000 est. value

Maintenance Movable Bridge and Tunnel Repair Contract, Statewide - 2021
Results
$10,000,001 to $20,000,000 est. value

Bridge Preventive Maintenance Contract 2020-3
Results
$5,000,001 to $10,000,000 est. value
Glassboro, NJ

Maintenance Orphan Bridge Repair Contract 2020-2
New Construction
Results
$5,000,000 est. value

Route 42 Bridges over Blackwood Railroad Trail
New Construction
Results
$20,000,001 to $50,000,000 est. value
Gloucester Township, NJ

Signature Bridge Preventive Maintenance Contract 2020-1
New Construction
Results
$10,000,001 to $20,000,000 est. value

Bridge Overlay Resurfacing Contract, Statewide - 2021
New Construction
Results
$5,000,001 to $10,000,000 est. value

Pedestrian Bridge Replacement Over Evans Mill Pond
New Construction
Results
Cherry Hill, NJ 08034

CBB Deck Repairs Project
New Construction, Renovation
Results
Camden, NJ

Route 76, Bridge Over Klemm Avenue Conrail and South Branch Newton Creek
New Construction, Infrastructure
Results
$50,000,001 to $100,000,000 est. value
Gloucester City, NJ 08030

Bridge Repairs and Resurfacing; Milepost 92 to 122; and the Newark Bay-Hudson County Extension (2022)
Renovation
Results

Reported 05/25/2022 12:00 AM
Project Title

Replacement of Somerdale Road (CR 677) Bridge 046C021 Over North Branch of Timber Creek, Gloucester Township

Physical Address View project details and contacts
City, State (County) Camden, Gloucester Township, NJ   (Camden County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Details

Bridge, New Construction.
Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents