Similar Projects
WPAFB Paint IDIQ Sources Sought
Design
$5,000,000 to $15,000,000 est. value
Wright Patterson Air Force Base, OH 45433

Penta Career Center - Masonry/ Facade Restoration 2021-2022
Bidding
Less than $620,000 est. value
Perrysburg, OH 43551

Doan Exterior Brick Repair
Bidding
$1,210,000 to $2,550,000 est. value
Columbus, OH

Big Run Maintenance Conversion
Post-Bid
Less than $250,000 est. value
Columbus, OH 43205

Practical Skills Building Moisture Renovation
Post-Bid
Columbus, OH 43207

Exterior Stair Replacement at Housing Units
Results
Less than $195,000 est. value
Caldwell, OH

Z--Cuva Exterior Paint
Results
$25,000 to $100,000 est. value
Brecksville, OH 44141

Cuyahoga Valley Career Center/Glass Block and Roof Replacement
Post-Bid
Brecksville, OH 44141

Eifs Repairs at Livingston High School
Results
Reynoldsburg, OH 43068

Braunstein Hall Facade Restoration
Post-Bid
Less than $2,000,000 est. value
Cincinnati, OH 45221

Parapet Wall Repairs
Results
Less than $115,000 est. value
Cincinnati, OH 45214

Porch Repair and Replacement at the Pickaway County Commissioners’ Office
Post-Bid
Less than $309,000 est. value
Circleville, OH 43113

Senior Center / Community Center Facade Improvements
Results
$24,000 est. value
Geneva, OH 44041

Canopy Repairs at Beachcrest A and B Buildings
Post-Bid
Cleveland, OH 44110

Building Facade Repairs
Results
$301,050 est. value
Ashland, OH 44805

Reported 02/25/2021 12:00 AM
Project Title

Link Building Exterior Envelope Repair Design/Build

Physical Address View project details and contacts
City, State (County) Warren, OH   (Trumbull County)
Category(s) Single Trades
Sub-Category(s) Finishes/Exterior
Contracting Method Competitive Bids.
Project Status Accepting Qualifications
Bids Due View project details and contacts
Estimated Value $982,400
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Total Project Cost: $982,400.00 Construction Cost: $682,500.00 The Link Building was constructed in 1986 as a physical connection between the Library building and the Main Classroom Building. It provides an enclosed circulation path as well as additional classrooms, support spaces and social spaces. The existing building skin is comprised of insulated metal panels on a structural girt system with an aluminum window system set into the metal panel modules. The system has become prone to leaks, and the panel design does not lend itself to isolated replacement. This project will remove the existing skin and replace it with another envelope system. The intention is to reuse the foundation and structural steel system and limit the work to the exterior wall only. The design should also improve the thermal envelope and increase energy efficiency. This project will also prepare Construction Documents for selective roof replacement/repair at the Technology Building.

Details

Division 09 - Finishes.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents