Similar Projects
Park Ave and El Centro Highway Crossings Construction - WD25UT03 - City of Napa
Infrastructure
Conception
$1,000,000 est. value
Napa, CA

Salvador Avenue Complete Streets - City of Napa
Infrastructure, Alteration
Conception
$1,000,000 est. value
Napa, CA 94558

Smittle Creek Trail Bridges
Infrastructure
Design
$2,000,000 CJ est. value
Napa, CA 94558

Yellow Rose Ranch
New Construction, Infrastructure
Design
$25,000,000 CJ est. value
Calistoga, CA 94515

Sanitary Sewer Manhole Adjustment Phase XII
Infrastructure
Bidding
$275,000 CJ est. value
Napa, CA 94558

2022 Bridge Repairs Project
Infrastructure
Bidding
$400,000 CJ est. value
Napa, CA 94558

Construction Mac; Pacnorwest
New Construction, Renovation
Post-Bid
$100,000 to $3,500,000 est. value

Indefinite Delivery Indefinite Quantity (IDIQ) Multiple Award Construction Contract (MACC) for New Construction, Renovation, and Repair of General Building Construction at Various Government Installations
New Construction, Renovation
Post-Bid

HMA, Roadway Excavation, Structural Conc and Modifying Lighting Systems
Infrastructure
Results
$42,000,000 est. value
CA

Spanish Flat Equipment Yard Repair Project
Renovation
Results
$250,000 est. value
Napa, CA 94558

Broadway Commercial Development
New Construction, Infrastructure
Pending Verification
$1,500,000 CJ est. value
American Canyon, CA 94503

Rancho De Calistoga Sewer Line Bank Stabilization Project
Infrastructure
Bidding
$100,000 CJ est. value
Calistoga, CA 94515

Multiple-Award Indefinite Delivery/Indefinite Quantity (IDIQ) Contract(s) for General Construction with Design/Build Capabilities
New Construction
Post-Bid
Less than $500,000,000 est. value

HSIP Cycle 10 Striping
Infrastructure
Results
$1,819,353 CJ est. value
Napa, CA 94558

IDIQ MACC Small Business Set-Aside for New Construction, Renovation, and Repair of Dry Utilities Construction Projects at Various Government Installations In CA, AZ, NV, UT, CO, and NM
New Construction, Renovation, Term Contract
Post-Bid
$300,000 to $20,000,000 est. value

Last Updated 07/29/2022 01:09 PM
Project Title

Lake Berryessa Asbestos Removal and Flooring

Physical Address View project details and contacts
City, State (County) Napa, CA 94558   (Napa County)
Category(s) Government/Public, Heavy and Highway
Sub-Category(s) Misc. Buildings, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $100,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

A. Title: Lake Berryessa Asbestos Removal and Flooring B. Work site location: Lake Berryessa Field Office, Multipurpose Building 5520 Knoxville Road Napa, CA 94558 C. Site Visit Information: SEE FAR 52.236-27 SITE VISIT (Construction) Alt 1 (Pg.63) D. Estimated Price Range: The estimated cost of this project is between $25,000 and $100,000. E. Set Aside Information: Total Small Business Set Aside: NAICS 238990 and applicable size standard of $16.5 million. F. Email Proposals to dfobbs@usbr.gov Period of Performance: 09/01/2022 to 04/01/2023 Introduction The Bureau of Reclamation (Reclamation) proposes to replace the deteriorated vinyl floor tile of the Lake Berryessa Field Office's Multipurpose Building. Doing so will involve the removal of the supporting mastic which has tested positive for asbestos. 2.0 Background The Lake Berryessa Multipurpose Building houses seven permanent and up to five seasonal maintenance division employees. In addition, a staff of four Napa County Sheriff's Deputies providing the Lake's marine patrol work from the building along with colleagues assigned to the Napa County Managing partner agreement. During interagency trainings, incidents, and busy holiday weekends, the staff utilizing the multipurpose building and its three restrooms quadruples as employees from Napa County's emergency response contract, the Sheriff's Office, California Highway Patrol, and California Department of Fish and Wildlife gather for briefings, meals, and breaks. Staff observed deficiencies in these work spaced during the COVID-19 Pandemic Stay at Home Order, and the 2020 LNU Lightning Complex Fire in particular. Like much of the Field Office, the Multipurpose Building dates to around 1980. Conditions of the restrooms and office flooring have deteriorated resulting in numerous areas of exposed mastic around the structure. In 2022, Field Office employees tested the building's flooring, received word that the mastic contained asbestos, and identified a need to restore the structure's flooring. 3.0 Scope The purpose of this project is to safely remove deteriorated vinyl floor tiles, remediate asbestoscontaining mastic, grind and seal the remaining concrete first story floors, and install linoleum. 4.0 Task The following list is not comprehensive and the contractor shall be responsible for performing all necessary tasks for removal of asbestos containing materials in accordance with applicable regulations. 140R2022R0021 - Lake Berryessa Asbestos Removal and Flooring 6 The contractor shall remove all equipment and surplus materials brought to the site, all wastes generated on site, and shall repair any damage to government property. 4.1 Prepare Building for Abatement - Removal of furniture and personal effects in the work site is the responsibility of Bureau of Reclamation and Napa County Sheriff's Office personnel prior to the period of performance provided one month of notice prior to starting work is provided. - Notify Bay Area Air Quality Management District and California Division of Occupational Safety and Health prior starting work and pay for notification fees. - Isolate work area. - Set up decontamination system for contractors working on the site. - Detach three toilets and set aside. 4.2 Remove Flooring and Mastic - Run negative air filtration, monitor air in the work area air quality, and perform work necessary for final air quality testing. - Remove and dispose of approximately 550 square feet of carpeting and linoleum and 1800 square feet of vinyl tiles in 4 offices, 2 hallways, 3 bathrooms, gym, stairwell. - Remove approximately 1800 square feet of mastic from concrete. - Contractor is responsible for transport, manifest, and disposal of project wastes at a properly licensed landfill for asbestos containing materials. - Arrange sampling and analysis of remaining subfloor to verify it is free from asbestos containing materials. Pass a visual inspection by Reclamation personnel to confirm that asbestos containing materials have been removed prior to installation of new flooring. 4.3 1st Floor Finishing - Grind remaining concrete, if needed, to an even surface. - Patch remaining cracks and divots as necessary. - Stain concrete a neutral color. - Seal floors with topical sealer. Resulting surface must be stain resistant, slip resistant, and easy to clean. - Install trim at the junction between finished walls and flooring. - Remove containment and equipment. 4.4 2nd Floor Finishing - Repair and sand the floor so that is level. - Install commercial vinyl flooring - Install trim at the junction between finished walls and flooring. - Remove containment and equipment. SITE VISIT (CONSTRUCTION) - ALT I FEB 1995 (a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors are urged and expected to attend the pre-proposal conference and review the Industry Day Site Visit Presentation (Section J). The industry day presentation is for informational purposes only. Section C, descriptions and Specifications takes precedence over the attachments. (b) An organized pre-proposal site visit has been scheduled for: Date: July 15, 2022 Time: 10:00 AM Pacific Time Place: Dufer Point Visitor Center, Napa, CA 94558 ( 3833'01.9"N 12213'53.3"W ) Interested participants may contact the following individual for additional information: Contact: Jennifer Onufer Email: jonufer@usbr.gov Phone: 707-732-8504 All solicitation questions shall be emailed to Denard Fobbs (dfobbs@usbr.gov ) not later than 7/21/2022. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 01 - General Requirements, Special Procedures, Environmental Procedures.
Division 02 - Existing Conditions, Environmental Assessment, Hazardous Material Assessment, Site Remediation, Asbestos Remediation.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Acoustical Ceilings, Flooring, Carpeting, Acoustic Treatment, Painting.
Division 12 - Furnishings.
Division 21 - Fire Suppression, Water-Based Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Irrigation, Planting.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents