Similar Projects
Trail Riders Bridge Replacement
New Construction, Infrastructure
Bidding
$25,000 to $100,000 est. value
Crested Butte, CO

Connecting Auraria Bridge
Infrastructure
Bidding
$5,200,000 to $5,700,000 est. value
Denver, CO 80204

Sources Sought/Request for Information for Pre-Fabricated Trail Bridges
Post-Bid

Sources Sought/Request for Information for Pre-Fabricated Trail Bridges
Post-Bid

County Road 73 Bridge Replacement
Results
Meeker, CO 81641

US Business 24 at MP 0.146
Results
Less than $1,000,000 est. value
CO

Marshall Road and Creek View - Infrastructure
New Construction, Renovation
Construction
Superior, CO 80027

Bridge Rehabilitation for South Wilcox and Plum Creek Parkway over UPRR
Renovation, Infrastructure
Bidding
$2,000,000 est. value
Castle Rock, CO

Stein Bridge Repair
New Construction, Infrastructure
Post-Bid
Aspen, CO

Snake Island Bridges Refurbishment
Results
Steamboat Springs, CO

Continental Bridge Repairs
Renovation, Infrastructure
Bidding
$100,000 to $250,000 est. value
South Fork, CO

I-76 Combined Projectes for Reconstruction of Roadway and Replacing Bridges
New Construction, Infrastructure
Post-Bid
$20,000,000 est. value
CO

Rehabilitation of 96th Avenue Bridge Over Bijou Creek - Phase 2
Results
Brighton, CO

US Highway 85 (Highlands Ranch Parkway to Dad Clark Gulch) Widening Project
Renovation, Infrastructure
Bidding
$3,000,000 est. value
Castle Rock, CO

Z--MATOC - IMR Bridges
New Construction
Post-Bid
$10,000,000 est. value

Reported 06/22/2022 12:00 AM
Project Title

Michigan River Bridge Replacement

Physical Address View project details and contacts
City, State (County) Walden, CO 80480   (Jackson County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected July 2022
Bids Due View project details and contacts
Estimated Value $250,000 to $500,000
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

This is a pre-solicitation notice. Proposals will be solicited by the USDA, Forest Service for the Michigan River Bridge Replacement project. The Medicine Bow-Routt National Forests and Thunder Basin National Grassland intends to issue a solicitation for the removal of a temporary ACROW bridge single reinforced single land truss bridge and install a single span steel beam superstructure with timber running planks and micropile foundation on National Forest System Road (NFSR) 792.1 -0.1 over South Fork Michigan River near Gould in Jackson County, Colorado (latitude 40.501970, longitude -106.022007). Location: Michigan River Bridge Project Location: The Michigan River Bridge located on National Forest System Road 792.1, south of Highway 14 near Gould, Colorado.

Details

Bridge, New Construction.
Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents