Similar Projects
Welcome Center to NY Line
Infrastructure
Conception
$4,655,634 CJ est. value
Lawrenceville, PA 16929

Welcome Center to NY Line
Infrastructure
Conception
$4,655,634 CJ est. value
Lawrenceville, PA 16929

Southwest of Euclid Bridge
Demolition, New Construction, Infrastructure
Design
$2,139,878 CJ est. value
Franklin Township, PA 16001

Southwest of Euclid Bridge
Demolition, New Construction, Infrastructure
Design
$2,139,878 CJ est. value
Franklin Township, PA 16001

US 6 over Long Run
Infrastructure, Renovation
Bidding
$1,000,000 CJ est. value
Wellsboro, PA 16901

US 6 over Long Run
Infrastructure, Renovation
Bidding
$1,000,000 CJ est. value
Wellsboro, PA 16901

Re-Bid High School Greenhouse at Wellsboro Area HIgh School
New Construction, Infrastructure
Post-Bid
$210,000 CJ est. value
Wellsboro, PA 16901

23 WHM SGL 211 Railroad Grade Road Phase 1
Infrastructure
Post-Bid

Structure Replacement - Bridge 16-0032
Renovation
Results
$100,000 to $500,000 est. value
PA

Corey Street Pavement Improvements and Improvements at Street Department Site - 2021
Infrastructure
Results
Mansfield, PA 16933

SR 1001 over Tributary to Susquehanna River
Demolition, New Construction, Infrastructure
Conception
$675,000 CJ est. value
Scott, PA 17815

SR 1003 - Brady Twp Line to SR 1001
Infrastructure
Design
$2,899,132 CJ est. value
Henderson Township, PA 16652

Renovations to Rock L. Butler Middle School
Renovation, Infrastructure
Bidding
$300,000 CJ est. value
Wellsboro, PA 16901

Surface Treatment Project
Infrastructure
Post-Bid
Wellsboro, PA

US6 Over Phoenix Run
New Construction, Infrastructure
Results
$1,000,000 to $2,499,999 est. value
PA

Last Updated 01/20/2023 12:05 AM
Project Title

SR 414 ov W Mill Creek

Physical Address View project details and contacts
City, State (County) Union Township, PA 16938   (Tioga County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Design Development, Construction start expected October 2023
Bids Due View project details and contacts
Estimated Value $955,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

SR414 over West Mill Creek Union Township Primary Improvement Type: Bridge Replacement As of January 20, 2023, the project is In development stage. Anticipated letting date is August 24, 2023. PennDOT - SR 414 ov W Mill Creek *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents