Similar Projects
Chester Creek Trail Phase 2
Design
$416,907 est. value
Media, PA 19063

Bituminous Seal Coat
Post-Bid
PA

Brandt School Road Betterment Marshall Township And Franklin Park Borough
Post-Bid
Harrisburg, PA

2019 Blairsville Highway Turn Back Project Old Main Street and South Liberty Street
Results
Blairsville, PA

Gettysburg Road Drainage and Widening Project Phase II
Results
Littlestown, PA

The Church Of Jesus Christ Of Latter-Day Saints, Parking Lot
Construction
$250,000 est. value
Berwick, PA 18603

Installation of the White Birch Road Extension at Humboldt Industrial Park
Construction
Hazleton, PA 18202

Yearly Contract for Flat Saw Cutting of Paved Surfaces
Term Contract
Post-Bid
New Stanton, PA 15672

Dirt and Gravel Roadway Project
Results
Orangeville, PA 17859

Whitebirch Road Extension
New Construction
Construction
Hazle Township, PA 18201

South Center Street Reconstruction
Post-Bid
Canton, PA

2019 Roadway Improvement Program
Results
Carnegie, PA 15106

Hertz Car Rental - New 4th Exit Lane
Construction
Philadelphia, PA 19153

Pavement & Grounds Facilities - General - Best Value
Post-Bid
Philadelphia, PA

Cuba Mills Road Improvement Project
Results
Mifflintown, PA

Last Updated 04/23/2021 07:24 AM
Project Title

Armstrong County Mill and Fill

Physical Address View project details and contacts
City, State (County) PA   (Armstrong County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $2,500,000 to $4,999,999
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This Project Consists Of Milling, Patching And Asphalt Overlay And Other Miscellaneous Construction, As Indicated On The Approved Drawings For The Improvement Of Approximately 113.08 Miles Of State Highways In Armstrong County, Commonwealth Of Pennsylvania. It Involves 25 Work Sites In Boroughs And Townships In Armstrong County. Also Included Is a Pipe Replacement Project On Sr 66 In Clarion County, Redbank Township From Segment 0060 Offset 1983 To Segment 0060 Offset 2487. 0203-0001cubic Yard76.000 02nc Class 1 Excavation 0203-0003cubic Yard10.000 01nc1 Class 1a Excavation 0203-0004cubic Yard9.000 02nc1 Class 1b Excavation 0205-0263cubic Yard5.000 02nc1 Selected Borrow Excavation Rock, Class r-3 0205-0264cubic Yard16.000 02nc1 Selected Borrow Excavation Rock, Class r-4 0205-0285cubic Yard1.000 02nc1 Selected Borrow Excavation, Coarse Aggregate, No. 57 0313-0337ton14.000 02ne Superpave Asphalt Mixture Design, Base Course, Pg 64s-22, < 0.3 Million Esals, 25.0 Mm Mix 0350-0121ton5.000 02nc, e Subbase (No. 2a) 4350-0121ton20.000 01nyesc, Eproj Subbase (No. 2a) For Longitudinal Patching 0413-0255ton70.000 02nf Superpave Asphalt Mixture Design, Wearing Course, Pg 64s-22, 0.3 To < 3 Million Esals, 9.5 Mm Mix, Srl-h 4413-0308ton9,021.000 01nyesfproj Superpave Asphalt Mixture Design, Wearing Course, Pg 64s-22, 3 To < 10 Million Esals, 9.5 Mm Mix, Srl-h For Longitudinal Patching 0413-2074ton47.000 02nf Superpave Asphalt Mixture Design, Wearing Course (Leveling), Pg 64s-22, 0.3 To < 3 Million Esals, 9.5 Mm Mix, Srl-l 4413-6007ton9,331.000 01nyesfproj Superpave Asphalt Mixture Design, Binder Course, Pg 58s-28, < 0.3 Million Esals, 19.0 Mm Mix For Longitudinal Patching 0413-6047ton3.000 02nf Superpave Asphalt Mixture Design, Binder Course, Pg 64s-22, 0.3 To < 3 Million Esals, 19.0 Mm Mix 0460-0004gallon8,665.000 01**Nf4 Asphalt Tack Coat (Ntt/Cntt) 4461-0001square Yard134.000 02nyesf4proj Asphalt Prime Coat Modified 0491-0019square Yard784.000 02nf3 Milling Of Asphalt Pavement Surface, Variable Depth, Milled Material Retained By Contractor 4491-0019square Yard121,909.000 01nyesf3proj Milling Of Asphalt Pavement Surface, Variable Depth, Milled Material Retained By Contractor For Longitudinal Patching e4601-7536linear Foot50.000 02nyeshproj 36" Reinforced Concrete Pipe, Type a, 7` - 3` Fill, Shore/Trench Box, 100 Year Design Life Modified a0616-1208each1.000 02nh Concrete End Sections For 36" Pipe o4601-0564linear Foot50.000 02nyeshproj 36" Thermoplastic Pipe, Group Vii, 12`-2` Fill, Shore/Trench Box, 100 Year Design Life Modified a0616-1258each1.000 Nh Thermoplastic End Section For 36" Pipe e0604-0313linear Foot108.000 02nh 18" Perforated Thermoplastic Pipe, Group Ip, 15`-1.5` Fill a0616-1252each1.000 02nh Thermoplastic End Section For 18" Pipe o0604-7313linear Foot108.000 Nh 18" Reinforced Concrete Pipe, Type b, (Open Joint), 15` - 1.5` Fill a0616-1202each1.000 Nh Concrete End Sections For 18" Pipe o0604-9363linear Foot108.000 Nh 18" Perforated Corrugated Aluminized Steel Pipe, Type i, (2 2/3" x 1/2" Corrugations), 16 Gage a0616-0602each1.000 Nh Aluminum Alloy End Sections, 16 Gage, For 18" Pipe 0605-2620each1.000 02nk Type d-w Endwall 0605-2731set2.000 02nk Type m Concrete Top Unit And Bicycle Safe Grate 0605-2850each2.000 02nk Standard Inlet Box, Height < /= 10` 0608-0001lump Sum1.000 01nx Mobilization 4608-0001lump Sum1.000 02nyesxproj Mobilization For Sr 66 Pipe Replacement 4609-0002lump Sum1.000 03nyesxproj Inspector`s Field Office And Inspection Facilities, Type a Modified 4609-0009lump Sum1.000 03nyesxstd Equipment Package Modified 0610-0002linear Foot22.000 02nh2 6" Pipe Underdrain Type i Backfill 0620-0400each1.000 02nj Terminal Section, Single 0620-0500linear Foot50.000 02nj Reset Guide Rail 0620-0872each1.000 02nj Buried-In-Backslope Terminal, Single Panel 0620-1600linear Foot263.000 02nj Type 31-s Guide Rail 0620-1660each1.000 02nj Type 31-Strong Post Anchor Terminal 4689-0003lump Sum1.000 01nyesxproj Cpm Schedule Modified 0851-0001each1.000 02nc1 Rock Energy Dissipator 0855-0003each1.000 02nm2 Pumped Water Filter Bag 0901-0001lump Sum1.000 01nq Maintenance And Protection Of Traffic During Construction 4901-0001lump Sum1.000 02nyesqproj Maintenance And Protection Of Traffic During Construction For Sr 66 Pipe Replacement 0901-0231day20.000 02nq Additional Warning Lights, Type b 0901-0232day20.000 02nq Additional Warning Lights, Type c 0901-0240square Foot200.000 02nq, r Additional Traffic Control Signs 0901-0270each25.000 02nq Sequential Warning Lights 0901-0320linear Foot482.000 02no 4" Standard Pavement Markings, Paint & Beads, Yellow 0901-0330linear Foot482.000 02no 4" Standard Pavement Markings, Paint & Beads, White 0901-0461each2.000 02nq Full-Matrix Changeable Message Sign Without Telecommunications 0937-0072each85.000 01no1, q Non Plowable Raised Pavement Markers (Two Way y/y) 0962-1000linear Foot351,800.000 01no 4" White Waterborne Pavement Markings 0962-1001linear Foot13,940.000 01no 6" White Waterborne Pavement Markings 0962-1005linear Foot521,850.000 01no 4" Yellow Waterborne Pavement Markings 9000-0004lump Sum1.000 02nc1proj Temporary Bypass Pump System Modified 9000-0200dollar5,000.000$1.00$5,000.0001yf1proj Repair Detour Route 9000-0411linear Foot500.000 01nfproj Warm Mix Asphalt Patch Drain 9203-0004cubic Yard507.000 01nc1proj Class 1b Excavation For Transverse Patching 9204-0001each6.000 01**Nc1proj Test Pits For Underground Utilities 9413-0308ton1,108.000 01nf1proj Superpave Asphalt Mixture Design, Wearing Course, Pg 64s-22, 3 To < 10 Million Esals, 9.5 Mm Mix, Srl-h For Transverse Patching 9966-0001each85.000 01no1proj Removal Of Existing Raised Pavement Markers

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents