Similar Projects
Wastewater Treatment Plant Hazardous Location Heater
Term Contract
Sub-Bidding
Dexter, MI 48130

HVAC and Mechanical Products
Term Contract
Post-Bid

Michigan Memorial Phoenix Project Laboratory New Dehumidification Unit in RM 2040 Bidpack 01 - Construction
Alteration
Post-Bid
Ann Arbor, MI 48105

Fume Hood Filters Replacement
Results
Ann Arbor, MI 48105

Replacement of Fabric Air Duct/Sock at Pool
Results
Whitmore Lake, MI 48189

HVAC and Mechanical Products and Solutions
Term Contract
Post-Bid

City Hall Duct Cleaning Project
Results
Ann Arbor, MI

HVAC Filter Services
Alteration
Post-Bid
Ann Arbor, MI 48104

Weatherization Contractor Services
Alteration
Results
Ann Arbor, MI

HVAC Preventive Maintenance
Alteration
Post-Bid
Ann Arbor, MI

AC and Lighting for Eberwhite
Alteration
Results
Ann Arbor, MI 48103

University Hospital - UH AC Unit ISO-Dampers
Alteration
Post-Bid
Ann Arbor, MI

Justice Center HVAC Condenser Replacement
Alteration
Results
Ann Arbor, MI 48104

RTU HVAC at Riverside Intermediate School
Alteration
Post-Bid
Manchester, MI 48158

Water Treatment Plants (WTP) HVAC Improvements - Phase II
Alteration
Results
$700,000 est. value
Ann Arbor, MI 48103

Last Updated 08/25/2022 12:03 PM
Project Title

Saline High School HVAC Controls Replacement Project

Physical Address View project details and contacts
City, State (County) Saline, MI 48176   (Washtenaw County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids
Project Status Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value $625,900 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

As of August 25, 2022, this project has not yet been awarded. A timeline for award has not yet been established. The Board of Education reserves the right to accept or reject any or all bids in whole or in part or, for reasons of establishing uniformity, delivery time or preference, to award the contract to other than the low bidder. The contents of RFP and Bidder (also referred to as Contractor in these documents) Proposal will become contractual obligations if a contract ensues. Failure of the Bidder to accept these obligations will result in cancellation of the award. Award of a contract by the District is subject to the Contractor executing a Contract, which shall incorporate the contents of this RFP and the Contractors Proposal and final approval if the same by the District's legal counsel. In compliance with MCL 380.1267, the bid shall be accompanied by a sworn and notarized statement disclosing any familial relationship that exists between the owner or any employee of the bidder and any member of the board, or the superintendent of the school district. The bid shall also be accompanied by a sworn and notarized statement disclosing whether the bidder is an Iran Linked Business in compliance with PA 517 of 2012. The Board shall not accept a bid that does not include these sworn and notarized disclosure statements. Certified check, money order or Bid Bond by an approved surety company must accompany each proposal in an amount not less than 5% of the bid amount. Price proposal shall be good for a period of no less than 60 days from the bid date, unless otherwise noted. Bid Bond can be included with the bid through online. Certified check and money order must be received prior to the bid due date and time at 7265 North Ann Arbor Road, Saline, MI 48176. AHU Start Date: February 1, 2023 Bid Results- 1. Bid Category#1-BuildingAutomation Control SystemEquipment Replacement and Installation Grand Total - Electro-Matic Visual, Inc - $184,300 2. BidCategory#2-BuildingAutomation Control SystemWiring Grand Total -Electro-Matic Visual,Inc - $128,650 3. BidCategories #1 -BuildingAutomation ControlSystemEquipment Relocatement & Installation andWiring Grand Total Amount -Electro-Matic Visual,Inc- $312,950 • AHU Substantial Completion Date: June 9, 2023 • VAV Start Date: June 12, 2023 • VAV Substantial Completion Date: August 18, 2023 • Final Completion Date: September 29, 2023 • All work can be completed for AHU and VAV during normal school hours. • Work after August 28, 2023, in the classrooms would have to be completed after student dismissal.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents