Last Updated | 03/10/2023 11:02 PM |
Project Title | Rolling 'A' Wastewater Treatment Facility - Phase 4 Expansion |
Physical Address | View project details and contacts |
City, State (County) | Dayton, NV 89403 (Lyon County) |
Category(s) | Heavy and Highway, Sewer and Water |
Sub-Category(s) | Lift and Pump Stations, Sewage Treatment Plant, Site Development, Water Lines |
Contracting Method | Competitive Bids |
Project Status | Results, Construction start expected April 2023 |
Bids Due | View project details and contacts |
Estimated Value | $19,990,000 [brand] Estimate |
Plans Available from | Civil Engineer |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The Project consists of constructing upgrades to and expansion of the Rolling 'A' Wastewater Treatment Facility (a Sequencing Batch Reactor (SBR) process system) to 1.6 million gallons per day (maximum 30-day average) and includes the following major work components: 1. Partial demolition and modifications to existing SBR 5 to repurpose the reactor to a flow Equalization Basin, including a mixing and partial aeration system. 2. New Equalization Pump Station downstream of the Equalization Basin to pump raw wastewater to the new Flow Splitter structure. 3. New Flow Splitter reinforced concrete structure for distribution of wastewater to the new and existing SBRs, including flow monitoring to each SBR basin. 4. Two new SBRs (SBR 1&2) consisting of reinforced concrete reactor basins with Sanitaire process equipment (mixers, pumps, decant mechanism, aeration diffusers, and associated instrumentation) to be provide and installed by the Contractor. 5. Partial demolition and replacement of existing Sanitaire process equipment in existing SBRs 3&4. 6. Partial demolition and modifications to existing SBRs 1A/B&2, to repurpose the reactors to a Sanitaire Vorelodos System (Digesters) for sludge thickening. Process equipment (mixers, pumps, decant mechanism, aeration diffusers, blowers, and associated instrumentation) to be provided and installed by the Contractor. 7. Replacement of three existing aeration blowers in the Operations Building. 8. New screw press in Solids Handling Facility. 9. Demolition of existing Sludge Pond and construction of new 1.7 million gallon Emergency Pond consisting of a geomembrane liner, ballast system, and associated piping. 10. New yard piping associated with the plant expansion. Other Details This Project is being funded through the State Revolving Fund Program (SRF). In accordance with Executive Order 12549, contractors, subcontractors, and material and service suppliers (including engineers) who's contract is expected to equal or exceed $25,000 must have a DUNS number and be registered in the US Government System for Award Management (SAM). This Project is subject to the implementation of the American Iron and Steel Act and other CWSRF programmatic requirements. This Project must comply with American Iron and Steel (AIS) requirements. AIS manufacturer's certifications must meet EPA provisions per P.L. 113-76, Consolidated Appropriations Act, 2014 and USDA provisions per P.L. 115-31, Consolidated Appropriations Act, 2017. Liquidated Damages $1,200.00 Per Day Bid Bond 5.00% Payment Bond 100.00% Performance Bond 100.00% Online Q&A Yes Q&A Deadline 02/16/2023 5:00 PM (PST) |
||||||||||||||||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |