Similar Projects
Southwest 54th Court Stormwater Improvements
Infrastructure
Bidding
$953,000 est. value
Dania Beach, FL 33314

Southwest 37th Terrace Stormwater Improvements
Infrastructure
Bidding
Dania Beach, FL 33312

Civil/Site Construction Services
Post-Bid
FL

Bay Drive Stormwater Improvements
Post-Bid
Pompano Beach, FL 33060

South Sewall's Point Road Phase 1
Results
$2,915,034 est. value
Sewall's Point, FL 34996

Furnish and Install 24-Inch Sanitary Force Main Along NW 170 St. from NW 97 Ave. to NW 75 Place, Contract No. S-947
Results
Less than $5,851,177 est. value
Miami, FL

Storm Water Drainage Pipe Lining- Annual
Term Contract
Bidding
FL

City Of Lynn Haven Push Button Maintenance, Repair and Minor Construction Contract
Post-Bid
Lynn Haven, FL 32444

Picayune Strand Restoration Project Southwest Protection Feature Levee, Collier County, Florida
Results
$25,000,000 to $45,000,000 est. value
FL

NPDES Corrective Items - Palm Beach NPDES Corrective Actions - Routine Maintenance
Infrastructure
Bidding
$250,000 est. value
FL

Construction Services for 2020 Stormwater Improvements Project
Post-Bid
FL

Airport Stormwater Improvements
Results
Less than $571,000 est. value
Stuart, FL 34996

Northwest Area Stormwater Improvements
Infrastructure
Bidding
$1,398,250 est. value
Deltona, FL

Epperson North, Villages A-1 through A-5
Post-Bid
FL

Front Street Complete Streets Project
Results
Melbourne, FL 32901

Last Updated 03/29/2022 03:48 PM
Project Title

Mirabelle Drive Category C FEMA Project

Physical Address View project details and contacts
City, State (County) Ferry Pass, FL 32514   (Escambia County)
Category(s) Sewer and Water
Sub-Category(s) Storm/Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Mirabelle Drive Category C FEMA Project generally consists of the replacement of a portion of an existing failed CMP conveyance system between Phase 3 and 4 of the Mirabelle Subdivision. This project will address significant failed sections which have caused erosion along the pipe through the easement. Two existing curb inlets and one existing junction box will be replaced as part of the proposed pipe replacement. Access to the work site will be through the 20-ft wide easement along lots 19/20, block A, Phase 4 and lots 39/40, block A, Phase 3. These lots are vegetated and fenced and it will be the contractors' responsibility to clear and grub the work area as a part of this project.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents