Similar Projects
Utilities - SH 132
Infrastructure
Design
$500,000 est. value

US-270B - Grade, Drain and Surface
Infrastructure
Design
$15,000,000 CJ est. value
Shawnee, OK 74801

Absentee Shawnee Police Safety Center
Infrastructure, Renovation
Bidding
$200,000 CJ est. value
Shawnee, OK 74801

Accommodate 5 Canadian Rangers Patrol Group (5CRPG), 9 Wing Gander
New Construction, Infrastructure
Bidding
$6,180,000 CJ est. value
Tribbey, OK 74878

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Y-- (MATOC) for Design-Build Construction Services
New Construction, Renovation, Demolition
Post-Bid
$500,000 to $20,000,000 est. value

Multiple Award Indefinite-Delivery Indefinite-Quantity (IDIQ) Task Order Contract For Construction, Repair, And Alteration With Design-Build And Incidental Abatement For Gsa/Pbs Region 7
Renovation
Results
$2,000 to $3,500,000 est. value

Regional Design/Build General Construction Indefinite Delivery Indefinite Quantity (IDIQ)
New Construction
Results

North Broadway Carwash
New Construction, Infrastructure
Pending Verification
$1,000,000 CJ est. value
Tecumseh, OK 74873

Shawnee Marketplace, Phase 2
New Construction, Infrastructure - 41,287 SF
Pending Verification
$11,000,000 CJ est. value
Shawnee, OK 74804

US 270 - Grade,Drain,Bridge and Surface
Infrastructure, Renovation
Design
$4,000,000 CJ est. value
Shawnee, OK 74801

Water System Improvements Rehabilitate Existing Water Storage Facilities
Infrastructure
Bidding
$200,000 CJ est. value
Asher, OK 74826

Absentee Shawnee Police Safety Center
New Construction, Infrastructure - 5,581 SF
Post-Bid
$2,000,000 CJ est. value
Shawnee, OK 74801

GAOA Alt/Repair Construction Services MATOC
Renovation
Results

Grade, Drain, Bridge and Surface - I 40
Infrastructure
Design
$20,500,000 CJ est. value
Tecumseh, OK 74873

Last Updated 03/29/2023 12:05 PM
Project Title

Tinker Operations Building

Physical Address View project details and contacts
City, State (County) Tribbey, OK 74878   (Pottawatomie County)
Category(s) Government/Public, Heavy and Highway, Sewer and Water
Sub-Category(s) Misc. Buildings, Site Development, Water Lines
Contracting Method Bids by Invitation
Project Status Bidding, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $4,332,340 [brand] Estimate
Plans Available from Owner's Representative
Owner View project details and contacts
Architect View project details and contacts
Description

Bid security percent:5% Comply with requirements in Section 312000 "Earth Moving" for excavating, trenching, and backfilling. 3.3 INSTALLATION OF PIPING A. Drawing plans, schematics, and diagrams indicate general location and arrangement of domestic water piping. Indicated locations and arrangements are used to size pipe and calculate friction loss, expansion, and other design considerations. Install piping as indicated unless deviations to layout are approved on coordination drawings. B. Install copper tubing under building slab according to CDA's "Copper Tube Handbook." C. Install valves according to the following: 1. Section 220523.12 "Ball Valves for Plumbing Piping." 2. Section 220523.14 "Check Valves for Plumbing Piping." D. Install domestic water piping level without pitch and plumb. E. Rough-in domestic water piping for water-meter installation according to utility company's requirements. F. Install piping concealed from view and protected from physical contact by building occupants unless otherwise indicated and except in equipment rooms and service areas. G. Install piping indicated to be exposed and piping in equipment rooms and service areas at right angles or parallel to building walls. Diagonal runs are prohibited unless specifically indicated otherwise. H. Install piping above accessible ceilings to allow sufficient space for ceiling panel removal, and coordinate with other services occupying that space. I. Install piping to permit valve servicing. J. Install nipples, unions, special fittings, and valves with pressure ratings the same as or higher than the system pressure rating used in applications below unless otherwise indicated. K. Install piping free of sags and bends. L. Install fittings for changes in direction and branch connections. M. Install unions in copper tubing at final connection to each piece of equipment, machine, and specialty. N. Install thermometers on inlet and outlet piping from each water heater. Comply with requirements for thermometers in Section 220519 "Meters and Gages for Plumbing Piping." O. Install sleeves for piping penetrations of walls, ceilings, and floors. Comply with requirements for sleeves specified in Section 220517 "Sleeves and Sleeve Seals for Plumbing Piping." P. Install sleeve seals for piping penetrations of concrete walls and slabs. Comply with requirements for sleeve seals specified in Section 220517 "Sleeves and Sleeve Seals for Plumbing Piping." Q. Install escutcheons for piping penetrations of walls, ceilings, and floors. Comply with requirements for escutcheons specified in Section 220518 "Escutcheons for Plumbing Piping.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Acoustical Ceilings, Flooring, Carpeting, Acoustic Treatment, Painting.
Division 12 - Furnishings.
Division 21 - Fire Suppression, Water-Based Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Irrigation, Planting.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents