Similar Projects
30-inch Quivira Transmission Main and 12-inch Distribution Main Replacements
Infrastructure
Bidding
$200,000 CJ est. value
Shawnee, KS 66216

New Century Adult Detention Center Mixing Valves Project
Renovation
Sub-Bidding
$430,000 CJ est. value
New Century, KS 66031

2022 JCPRD Mechanical and Plumbing Services IDIQ
Term Contract
Post-Bid
KS

Jefferson County Jail Phase 1 Plumbing Fixture Replacement
Alteration
Post-Bid
$250,000 to $500,000 est. value
Oskaloosa, KS 66066

On-Call Plumbing Services
Term Contract
Results
De Soto, Edgerton, Gardner, Leawood, Lenexa, Merriam, Mission, New Century, Olathe, Overland Park, Prairie Village, Roeland Park, Shawnee, Spring Hill, KS 66061

Booster Pump Station Improvements
Infrastructure
Results
$92,326 CJ est. value
Wolf Creek, KS 67481

Temporary Bypass Pumping On-Call
Alteration
Post-Bid
Olathe, KS

Morton Road 6" Waterline Project
Infrastructure
Results
$699,488 CJ est. value
Atchison, KS 66002

Prairie Band Potawatomi Nation (PBPN) Health Center - Low Flow Water Saving
Alteration
Post-Bid
$400,000 est. value
Mayetta, KS 66509

Contract 1: Raw Water Transmission Pipeline Contract 2: 56th and Kincaid Pipeline
Infrastructure
Results
$1,242,620 CJ est. value
Topeka, KS 66612

Streambank Stabilization work at John Redmond #2
Infrastructure
Post-Bid
$250,000 CJ est. value
Burlington, KS 66839

El Dorado Correctional Facility Administration Building Chilled Water Piping System Improvements
Renovation
Results
$116,338 CJ est. value
El Dorado, KS 67042

Basehor Civic Campus - Mass Grading Project
Infrastructure
Post-Bid
$65,000 CJ est. value
Basehor, KS 66007

Water Treatment Plant Expansion Project - Phase II Rural Water District #2
Addition, Demolition, Infrastructure, Renovation
Results
$15,998,000 CJ est. value
Paola, KS 66071

2022 Arbor Valley Subdivision Improvements Phase 1
Infrastructure
Post-Bid
$1,400,000 CJ est. value
Goddard, KS 67052

Last Updated 06/07/2023 02:33 PM
Project Title

Water Distribution System to serve Courtyards at Jacobs Farm Addition tied with Sanitary Sewer Improvements to serve Courtyards at Jacobs Farm Addition

Physical Address View project details and contacts
City, State (County) Wichita, KS 67202   (Sedgwick County)
Category(s) Single Trades
Sub-Category(s) Plumbing
Contracting Method Competitive Bids
Project Status Results, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $530,125 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

A Bid Bond in the Amount of Five Percent (5%) of the Total Bid or an Annual Bid Bond is Required Prior to Bid Opening. Bidders Are Advised to Contact the Office of the City Engineer (316-268- 4501) Should They Have Any Questions or Concerns About the Plans, Special or Supplemental Provisions, Minority Status, or the Proper Preparation of the Bid Document. The Bid Form Shall Be Prepared Using Unit Prices Per Bid Item, Unless Otherwise Noted. Start Date. The work order on these projects shall be issued 30 (thirty) calendar days after the date on which the contract for these projects has been awarded to the successful bidder. The work on these projects shall be completed within 45 (forty five) total for both projects working days from the date of beginning work for all projects and in accordance with the plans and Standard Specifications. Working days will be charged as provided for in the Standard Specifications, once the work order is issued. The non-availability of material shall not prevent working days from being assessed Any questions prior to bid submittal should be directed to Matthew Schultze, P.E., Subdivision Engineer, at (316) 268-4235 or mschultze@wichita.gov

Details

Division 22 - Plumbing, Common Work Results for Plumbing.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents