Similar Projects
Purchase of Materials for the Cardnell Substation
Term Contract
Post-Bid
Glenwood Springs, CO 81601

Cardnell Substation - Materials
Post-Bid
Glenwood Springs, CO 81601

East Substation E1 Transformer Replacement
Results
Loveland, CO 80537

Midway KV1A Replacement
New Construction
Results
$1,000,000 to $5,000,000 est. value
Colorado Springs, CO

Design-Build of "Eastside" Distribution Substation
Term Contract
Construction
Fountain, CO 80817

Rattlesnake Solar - Hudson
New Construction
Construction
Hudson, CO

Construction Services for The Second Controllable Grid Interface (CGI) Project at The NREL Flatirons Campus
New Construction
Post-Bid
Boulder, CO

AULT-Badwater-North Cody Equipment Install
Results
$1,000,000 to $5,000,000 est. value
CO

Horizon Substation Control Enclosure
New Construction
Post-Bid
CO

Cardnell Substation Construction - Installation
Results
Glenwood Springs, CO 81601

Request For Information: Steel Structures for Western Area Power Administration (WAPA)
New Construction, Term Contract
Post-Bid

Horseshoe Electrical Substation Improvement Project
Results
Loveland, CO 80537

SEP Horizon Three Phase Variable Shunt Reactor
New Construction
Post-Bid
Colorado Springs, CO

Horseshoe Electric Substation Improvement
Results
Loveland, CO 80537

Shunt Reactor for Hayden Substation
Term Contract
Post-Bid
Hayden, CO

Reported 08/14/2021 12:00 AM
Project Title

CMAFS Substation

Physical Address View project details and contacts
City, State (County) Colorado Springs, CO 80926   (El Paso County)
Category(s) Industrial/Manufacturing
Sub-Category(s) Electric Substation
Contracting Method Competitive Bids.
Project Status Request for Quotations
Bids Due View project details and contacts
Estimated Value
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Non-personal service to provide all management, tools, materials, parts, equipment and labor necessary to inspect, perform annual maintenance, testing and repairs on the substation at Cheyenne Mountain Air Force Station: - Maintenance Scheduling Services - Substation Maintenance (Annual and Service - Call) - Substation Testing - Repairs

Details

Electric Substation, Renovation.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Substations, Power Distribution Units, Transfer Switches.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents