Similar Projects
8-Inch and 12-Inch Ductile Iron Water Main Replacement
Infrastructure
Bidding
$7,500,000 to $9,000,000 est. value
San Francisco, CA

Locating Subsurface Facilities
Alteration
Bidding
Riverside, CA 92519

Valve Inspection Maintenance and Repair Services
Term Contract, Alteration
Post-Bid
Santa Clara, CA

Z1da--Service-Renovate Domestic Water Piping Projects FMS
Term Contract
Post-Bid
$5,000,000 to $10,000,000 est. value
Loma Linda, CA

Renovation of the Existing Underground Steam Distribution System
Infrastructure
Results
$13,222,600 est. value
Yountville, CA 94599

Hydronic Valve Replacement
Infrastructure
Results
Channel Islands Beach, CA

Camino Intertie Pressure Reducing Station
Infrastructure
Bidding
$650,000 to $700,000 est. value
Placerville, CA

Professional Engineering Services For Water System Improvements In Madera County Maintenance District No. 36 Eastin Arcola
Infrastructure
Post-Bid
Madera, CA

North Long Beach Collection Main Control Valve Upgrade
Infrastructure
Results
$1,116,000 est. value
Long Beach, CA 90899

City of Poway Treated Water Facilities and Redundant Pipeline Project
Infrastructure
Bidding
$1,310,000 est. value
Poway, CA 92064

Groundwater Pre-Filter and Carbon Filtration Removal and Replacement and Repair Services
Term Contract
Post-Bid
Paramount, South Gate, CA 90280

3rd Street, Buena Mesa Drive, and Calimesa Boulevard 24" Recycled Water Pipeline
Infrastructure
Results
$4,000,000 to $6,000,000 est. value
Calimesa, Yucaipa, CA 92399

Better Market Street - Phase 1
Infrastructure
Bidding
$24,000,000 est. value
San Francisco, CA 94158

Water System Repair
Alteration
Post-Bid
Placerville, CA 95667

Los Nietos, Line D, Sorensen Lateral
Infrastructure
Results
$500,000 to $775,000 est. value
Los Nietos, CA 90610

Reported 11/03/2021 12:00 AM
Project Title

Fire Flow Improvement Program Ridge Road Pipeline Replacement Project

Physical Address View project details and contacts
City, State (County) Tiburon, CA   (Marin County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value $1,760,000
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

To furnishing labor and equipment for the installation of approximately 4,660 linear feet of 8-inch, 180 linear feet of 6-inch welded steel pipe, 470 linear feet of 10-inch HDPE pipe with 8-inch, 6-inch, & 4-inch valves, fittings, pipeline disinfection and appurtenances.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents