Similar Projects
Atlantic City Expressway Bridge #28 Rehabilitation Project
Bidding
Atlantic City, NJ

Route 130, Charleston Road / Cooper Street (CR 630) to Crafts Creek
Bidding
$20,000,001 to $50,000,000 est. value
NJ

Replace Walking Bridge on Dave Marion Road
Post-Bid
Toms River, NJ 08753

Site 158 Replace Walking Bridge on Dave Marion Road
Post-Bid
Toms River, NJ 08753

Rehabilitation of Structure No.0600-001: CR 637 (Fortescue Road) Over Fortescue Creek, Township of Downe
Results
Bridgeton, NJ 08302

Replacement of Bridge 2-B-160, Baekeland Avenue Over Ambrose Brook
Results
$3,219,193 est. value
Piscataway, NJ 08854

Chelsea Tower Skywalk
New Construction
Construction
Atlantic City, NJ 08401

FedEx Warehouse Expansion
New Construction, Addition - 3,321 SF
Construction
$4,020,500 est. value
Keasbey, NJ 08832

Bridge W-43 Priority Repairs on County Route 18 (Ocean Avenue) over the Shark River
Post-Bid
Avon-by-the-Sea, Belmar, NJ 07715

Replacement of Bridge No. 06B0-003 Burlington Road (CR638) Over Indian Fields Branch, Bridgeton City
Results
Bridgeton, NJ 08302

Maintenance Service for County Hydraulic Bridges
Post-Bid
NJ

Miscellaneous Steel Repairs, First and Second Structures
Results
Less than $6,261,000 est. value
New Castle, DE - Pennsville, NJ

Reconstruction of Bridge W-36 on Remsens Mill Road over Shark River
Post-Bid
Neptune, NJ 07753

S-Span Deck Replacement for the Burlington-Bristol Bridge
Results
Burlington, NJ 08016

Reconstruction of Bridge A-44 on County Route 537 (Colts Neck Road) Over Slope Brook
Post-Bid
NJ 07753

Last Updated 01/30/2019 05:22 AM
Project Title

Maintenance Job Order Contracting (JOC) Bridge Repairs, South - 2018

Physical Address View project details and contacts
City, State (County) (Atlantic, Burlington, Camden, Cape May, Cumberland, Gloucester, Mercer, Middlesex, Monmouth, Ocean, Salem Counties)
Category(s) Heavy and Highway
Sub-Category(s) Bridge
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $5,000,001 to $10,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description Maintenance Job Order Contracting (JOC) Bridge Repairs, South - 2018, Various Locations, Atlantic, Burlington, Camden, Cape May, Cumberland, Gloucester, Mercer, Middlesex, Monmouth, Ocean and Salem Counties. Bridge: Quantity Unit Description 3,865,000.00 Pct Adjustment Factor - Normal Working Hours 427,500.00 Pct Adjustment Factor - Other-Than-Normal Working Hours
Details
Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents