Similar Projects
Drinking Water System Improvements
Infrastructure
Bidding
$1,517,835 est. value
Hookerton, NC

FY22 Large Diameter Water/Sewer Service Contract 1
Infrastructure
Bidding
Charlotte, NC

46--Water Fountain With Alkaline Water Filter System and Installation
Post-Bid
Fort Bragg, NC 28310

Flow Monitoring Services
Term Contract
Post-Bid
Charlotte, NC 28216

Mallard Creek WRF Reuse Line Extension to UNCC
Results
Charlotte, NC 28216

Back Flow Devices Testing, Repair, Replacement and Re-Testing
Results
Greensboro, NC 27401

Patton Avenue Water Distribution Project
Infrastructure
Bidding
Asheville, NC 28803

USDA Water and Sewer Improvements Contract 1 - Water Main Improvements Contract 2 - Sanitary Sewer Improvements
Post-Bid
West End, NC 27376

Phase 4 Water 4 Improvements Project
Results
Less than $1,500,000 est. value
Enfield, NC 27823

Bodenheimer Steam Manhole Repair
Infrastructure
Bidding
Boone, NC

USDA Water and Sewer Improvements Contract 3 - Elevated Storage Tank
Post-Bid
West End, NC 27376

Design Build Services for a 24-Inch Water Main Extension
Results
Less than $7,267,250 est. value
Concord, NC 28026

2020 Street, Drainage, Water and Sewer Improvements
Post-Bid
$630,000 to $730,000 est. value
Dunn, NC 28334

Crossroads Emergency Interconnection
Results
Less than $1,808,915 est. value
Cary, NC 27513

Leak Detection Services
Term Contract
Post-Bid
Charlotte, NC 28216

Last Updated 02/07/2022 12:22 PM
Project Title

Whispering Pines Ep No. 1 - Chemical Feed Improvements

Physical Address View project details and contacts
City, State (County) Whispering Pines, NC   (Moore County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method General Contractor to Subcontract.
Project Status Contract Award
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Clearing & Grubbing Underbrush, Tree Protection of Existing Pines, Undercut existing Gravel Parking area, Site Grading for Building Pad, Complete 6-inch Dia. Water Main Loop with Tie-in from existing water system, Installation of No. 57 Washed Stone Base for Building Pad, Provide Offload Crane & Installation of 12 Ft. x 14 Ft. x 10 Ft. Height (Owner-Supplied) Chemical Feed Building on Stone Base (Projected Delivery on November 19, 2021), Coordination of All Utilities onsite once Building is Set, Set Electric Meter Base, Route Electrical Power from Meter Base through wall into Pre-wired Building; Install and Provide Power to (Owner-Supplied) Control Valve, Ultrasonic Water Meter & Signalizer, Chemical Injector & Static Mixer; Contractor Shall Install Complete Zinc Orthophosphate Chemical Feed System and all required Mechanical, Piping, Valves, Fittings & Restraints, and All Misc. Appurtenances as well as Perform All Required Pressure & Water Quality Testing. Contractor shall then Coordinate Interior Electrical with (Owner-Supplied) SCADA Equipment and work alongside Owner’s SCADA Equipment Provider throughout installation. Contractor Shall obtain All required Building Permits and Fees including Duke Power Company Electrical Service Installation fees. The Project has an expected duration of 45 days.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates.
Division 33 - Utilities, Operation and Maintenance of Utilities, Operation and Maintenance of Water Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Metering, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities.
Division 46 - Water and Wastewater Equipment, Water and Wastewater Chemical Feed Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents