Similar Projects
Pump And Well For Florence Sports Complex
Bidding
Florence, SC

Effluent Pumps Rehabilitation Project
Post-Bid
SC

Well Pump Replacement
Post-Bid
Saint George, SC 29455

Irrigation Well/Pump Repair/Replacement
Results
Florence, SC

Mable T. Willis Boulevard Well
Results
Walterboro, SC 29488

Provide and Install Two New Fiberglass Sewer Tanks and Grinding Pumps at Charleston County K-9 Facility
Post-Bid
North Charleston, SC 29405

Replace Existing 35 Year-Old Potable Well at Waddell Mariculture Center
Results
Bowman, SC

New Well No. 4 and Raw Water Main for Water Plant No. 5
Post-Bid
Sumter, SC 29150

Well Drilling Services for the Construction of a Well at Samworth WMA
Results
Less than $29,014 est. value
Georgetown, SC 29440

Schwartz Wastewater Treatment Plant Philly RAS Pumps
Post-Bid
Conway, SC 29528

Buck Hall Well Construction
Results
Less than $25,000 est. value
McClellanville, SC 29458

Installation of Residential Wells (18 Sites)
Post-Bid
Adams Run, Edisto Island, McClellanville, Ravenel, Wadmalaw Island, SC 29449

CWS Hanahan Water Treatment Plant Pump and Motor
Results
Less than $217,761 est. value
Charleston, SC 29402

Midtown Sewer Improvements
Post-Bid
Shell Point, SC

Replace Existing Well Pump and Motor at Loris High School
Results
Loris, SC 29569

Last Updated 02/27/2020 11:25 AM
Project Title

Well Drilling Services for the Construction of a Monitoring Well at Donnelly WMA

Physical Address View project details and contacts
City, State (County) Green Pond, SC 29446   (Colleton County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $27,555
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Contractor will provide well-drilling services to the South Carolina Department of Natural Resources, Land, Water and Conservation Division (SCDNR) at the Donnelley Wildlife Management Area (WMA) in Colleton County. The contract calls for the construction of one monitoring well with a total depth of 520 ft (feet). The Contractor is responsible for providing all necessary materials and for constructing, grouting, developing, and finishing the well. The well will be used by SCDNR to monitor groundwater level and specific conductivity, consequently, no permanent pump will be installed in the well.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents