Similar Projects
Bondecroft Elementary School Addition
Addition
Conception
Sparta, TN 38583

Virtual School Offices Build Out
New Construction, Renovation, Addition, Build-Out
Design
$4,000,000 est. value
TN

Three Rivers Learning Center Expansion
Renovation, Addition - 13,013 SF
Bidding
$3,000,000 est. value
Newport, TN 37821

Hunter Elementary School
Renovation, Addition
Bidding
Elizabethton, TN 37643

Bradford Elementary Classroom
Addition
Sub-Bidding
Bradford, TN 38316

The Bright School - Phase II
Renovation
Post-Bid
Chattanooga, TN 37405

Catlettsburg Elementary School Four Classrooms
Addition
Post-Bid
Sevierville, TN 37876

Northwest Elementary School
New Construction
Results
Knoxville, TN

Dogwood Elementary School Outdoor Classroom
New Construction
Results
Germantown, TN 38139

Lightbridge Academy
New Construction - 10,568 SF
Construction
$2,840,000 est. value
Hendersonville, TN 37075

Floor Replacement for Mitchell-Neilson Primary School
Alteration
Bidding
Murfreesboro, TN 37129

District-wide Improvements
Renovation
Post-Bid
Sneedville, TN

Brickey-Mccloud Elementary School
Addition
Results
Knoxville, TN 37918

Frazier Elementary Cafeteria Addition
Addition
Bidding
Dayton, TN 37321

Greene County Schools Improvement
Renovation
Post-Bid
Afton, Greeneville, Mosheim, TN 37745

Last Updated 04/11/2022 09:04 AM
Project Title

East Montgomery ES Pod Reconfiguration

Physical Address View project details and contacts
City, State (County) Clarksville, TN   (Montgomery County)
Category(s) Education
Sub-Category(s) Elementary School
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Reconfiguration of multiple 4-classroom pods. The work shall be phased as follows: Phase I – one 4-classroom pod Phase II – two adjacent 4-classroom pods Phase III – two adjacent 4-classroom pods

Details

Elementary School, Renovation.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Ice Machines, Educational and Scientific Equipment, Audio-Visual Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Casework, Countertops, Office Furniture, Institutional Furniture, Classroom Furniture.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Common Work Results for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents