Similar Projects
Warrior Met Coal - Barge Load-out Facility
New Construction
Conception
$50,000,000 est. value
Jasper, AL 35503

Conecuh Ridge Distillery
New Construction - 26,319 SF
Design
$14,000,000 to $15,000,000 est. value
Troy, AL 36082

Construction of a New Coastal Office and Lab facility
New Construction
Bidding
Mobile, AL 36628

Water World - Phase II Renovations
New Construction, Renovation
Bidding
$1,800,000 est. value
Dothan, AL 36303

Construction of Pre-Fabricated Metal Building
Post-Bid
Hazel Green, AL 35750

Mallard Fox Creek Port Cottonseed Warehouse and Storage Facility
Post-Bid
Decatur, AL 35601

Metal Building for District Six
Results
Huntsville, AL 35801

New City Shop
New Construction - 6,800 SF
Results
Atmore, AL 36502

Climate Storage - Phase II
New Construction, Demolition - 38,049 SF
Construction
$5,000,000 to $10,000,000 CJ est. value
Birmingham, AL 35213

Ben E. Keith
New Construction - 423,681 SF
Construction
$100,000,000 est. value
New Brockton, AL 36351

Logistics Park
New Construction
Pending Verification
$16,000,000 est. value
Mobile, AL

Cypress Business Park Logistics Subdivision
New Construction
Pending Verification
Mobile, AL 36619

Construction of Equipment Warehouse
New Construction
Bidding
Mobile, AL 36608

Construction of 45,000 SF Metal Building, Geneva County Industrial Park
- 45,000 SF
Post-Bid
Geneva, AL 36340

Purchase and Installation of Two (2) New 40 Ft. X 50Ft. Metal Buildings
Results
Loxley, AL 36551

Reported 09/20/2021 11:37 AM
Project Title

Skyland Self Storage Facility

Physical Address View project details and contacts
City, State (County) Tuscaloosa, AL 35405   (Tuscaloosa County)
Category(s) Commercial
Sub-Category(s) Warehouse/Storage
Contracting Method Bids by Invitation.
Project Status Seeking Site Plan Approvals
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Details

Warehouse/Storage, 2 Stories Above Grade, Approximately 78,400 SF New Construction.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Metal Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Door Hardware.
Division 09 - Finishes, Flooring.
Division 10 - Specialties, Signage, Flagpoles.
Division 11 - Equipment, Parking Control Equipment.
Division 14 - Conveying Equipment, Elevators.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical, Lighting, Interior Lighting, Exterior Lighting.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents