Similar Projects
Club Fitness Roof and HVAC Replacement
Post-Bid
Addison, IL 60101

Roof Replacement
Post-Bid
Elgin, IL 60120

Blackstone Elementary Reroof
Results
Mendota, IL 61342

Water Reclamation Facility Roof Rehabilitation
Results
Mundelein, IL 60060

Reroofing & Tuckpointing
Construction
Oak Park, IL 60302

On Call Roofing Repair Services
Term Contract
Post-Bid
West Chicago, IL 60185

Community Center Filter Room Roof
Results
Wheaton, IL 60189

Roofing Envelope Services
Post-Bid

Cosley Zoo Roof
Results
Wheaton, IL 60187

Multi-Tiered Guaranteed Savings Contract
Term Contract
Post-Bid
Grayslake, IL 60030

City Yards Warm Storage Roof Replacement
Results
Rockford, IL 61104

Roof Replacement at Building L
Results
Glen Ellyn, IL 60137

Multiple Roof Replacement
Renovation
Results
Rantoul, IL 61866

Replace Roofing System & Repair Interior
Results
$100,000 to $150,000 est. value
Zion, IL 60099

Replace Roofing System
Results
$300,000 to $400,000 est. value
Sterling, IL 61081

Last Updated 10/20/2020 10:28 AM
Project Title

Scattered Sites Roof Replacements Phase III

Physical Address View project details and contacts
City, State (County) Peoria, IL 61605   (Peoria County)
Category(s) Single Trades
Sub-Category(s) Roofing
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The PHA provides federally subsidized housing and housing assistance to low-income families and manages two (2) multi-family apartment complexes, one (1) senior apartment complex, one (1) hundred and eighteen (118) scattered site units located throughout the City of Peoria, thirty (30) public housing units at RiverWest. RiverWest South, LP will also be serviced under this contract and consist of seven (7) original units at RiverWest South with an additional twenty-six (26) units built with tax credit funding. The 26 units at RiverWest South LP are taxable units. Install new laminated shingles (nail down). Removal of existing roofing materials to wood deck, prior to installing new shingles. Repair any damaged areas (holes, soft areas). All cost related to dumpsters, hauling, dump fees and permits. Ice barrier roofing underlayment is required to be installed in accordance with the building codes. Replacement of rubber boots, vent pipes, flashing, drip edge (white), vents and ridge cap. Replacement of roof materials includes front entry roof and rear shed roof. Certain Teed Landmark shingles or approve equal by Owner. Color match existing shingles Georgetown Clay or approved color of equal match, (Architectural Shingles). Repair and replacement of damages to lawns, landscaping and buildings. Proper site cleanup of construction materials daily: shingles, nails, flashing and any other debris.

Details

Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents