Similar Projects
Mcgee Street Bridge - Erosion and Overlay Repairs - City of Sherman
Infrastructure
Conception
$900,000 CJ est. value
Sherman, TX 75092

Lamberth Road Expansion - Shady Oaks To Friendship Road - City of Sherman
Infrastructure
Conception
$4,600,000 CJ est. value
Sherman, TX 75090

Heritage Ranch - Phase 2-4
New Construction, Infrastructure
Design
$100,000,000 CJ est. value
Sherman, TX 75092

Remedial Repair Attoyac Bayou Site 21
Infrastructure
Design
$250,000 CJ est. value
Nacogdoches, TX 75961

Whitewright Nature Park Pond Renovation
Infrastructure
Bidding
$321,000 CJ est. value
Whitewright, TX 75491

Mantua Point Phase 2A and 2B Grading Package
Infrastructure
Post-Bid
Van Alstyne, TX

Concrete, Ramp and Asphalt Paving Project
Infrastructure
Post-Bid
$2,000,000 CJ est. value
Denison, TX 75021

Water Well Site at 1E Improvements Project
Infrastructure
Results
$2,023,376 CJ est. value
Aubrey, TX 76227

Pavement Repair, Sherman Aem
Infrastructure
Results
$46,300 CJ est. value
Sherman, TX 75090

Home Place Partners - Gallagher Warehouse
New Construction, Infrastructure - 7,500 SF
Construction
$1,200,000 CJ est. value
Sherman, TX 75090

Classic Chevrolet Cadillac of Denison
New Construction, Infrastructure - 75,200 SF
Construction
$18,500,000 CJ est. value
Denison, TX 75021

Hampton Inn & Suites Sherman
New Construction, Infrastructure - 49,260 SF
Pending Verification
$6,000,000 CJ est. value
Sherman, TX 75092

QuikTrip #1915
New Construction, Infrastructure - 5,312 SF
Pending Verification
$725,000 CJ est. value
Sherman, TX 75090

Progress Drive Construction - Progress Rail And Flanary Road - City of Sherman
Infrastructure
Conception
$2,100,000 CJ est. value
Sherman, TX 75092

Freedom Jeep Showroom Addition / Sherman
Addition, Demolition, Infrastructure - 9,887 SF
Design
$2,970,000 CJ est. value
Sherman, TX 75092

Last Updated 04/24/2023 07:34 PM
Project Title

Construction of Sweet Water Creek Lift Station

Physical Address View project details and contacts
City, State (County) Van Alstyne, TX 75495   (Grayson County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $2,000,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Van Alstyne MUD No. 3 , Construction of Sweet Water Creek Lift Station . Project scope includes construction of a lift station and related appurtenances. Each Bid must be accompanied by a bid bond or a certified or cashier's check, acceptable to the Owner, in an amount not less than 5 percent of the total amount bid, as a guarantee that the successful bidder will enter into the Contract and execute the Bonds on the forms provided and provide the required insurance certificates within 7 days after the date the Contractor is notified. The Successful Bidder, if any, will be the responsible Bidder which in the Board's judgment will be most advantageous to the District and result in the best and most economical completion of the Project. The Owner reserves the right to reject any or all Bids and to waive all defects and irregularities in bidding or bidding process except time of submitting a Bid. Submit written questions (via email jessica.lee@pelotonland.com) concerning the bids by Tuesday, February 28, 2023 by 5:00 pm : The project is located in Van Alstyne MUD No. 3 in Collin County, Texas. The site may be reached by traveling north from Dallas on US Highway 75, following signs for Van Alstyne, then take exit 49 North to CR 371. Head east on CR 371 approximately 300 feet and turn north on CR 373 for approximately 0.5 miles and turn east on CR 1106 for approximately 2.5 miles. The project site resides at the intersection of CR 1106 and CR 830.

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents