Similar Projects
Parking Lot Paving
Infrastructure
Bidding
Tybee Island, GA

Parking Lot Paving – Mountain Regional Library Branch
Alteration
Bidding
Young Harris, GA 30582

Cumming City Center, FCHS Parking Lot
Post-Bid
Cumming, GA 30040

Nash Street Extension Project
Post-Bid
Lawrenceville, GA 30046

Parking Lot Resurfacing Repair of the Welcome Center Parking Lot
Results
Lincolnton, GA 30817

Dewar Elementary School Drive Way
Results
Valdosta, GA 31605

Emmanuel Seventh Day Adventist Church Parking Lot Expansion
New Construction
Construction
Lithonia, GA 30058

1200 Lake Hearn Medical Office Building Parking Lot Improvements
Renovation
Construction
Sandy Springs, GA

Margaret Street Pedestrian Improvements Project
Alteration
Bidding
Fairburn, GA 30213

Judicial Building ADA Compliance Project
Post-Bid
Rome, GA 30161

Greenville Sidewalk and Street Scape Project
Results
Less than $69,669 est. value
Greenville, GA 30222

CVS #4717 Partial ADA Project
Renovation
Construction
$38,000 est. value
Atlanta, GA 30311

Houze Road Multi-Use Trail
Infrastructure
Bidding
Roswell, GA 30076

Annual Contract for Sidewalk Construction Services
Term Contract
Post-Bid
Hampton, GA 30228

Tarboro Fire Station Parking Lot
Results
White Oak, GA 31568

Last Updated 06/28/2021 12:56 PM
Project Title

Alabama Street Greenbelt Spur

Physical Address View project details and contacts
City, State (County) Carrollton, GA 30117   (Carroll County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Work consists of approximately 4,500 lf of 5” thick, 10’ wide concrete multi-use trail along Alabama Street. The project begins at the existing Carrollton GreenBelt trailhead near the Little Tallapoosa River and ends at 4th Street. The project will include construction of concrete trail along the north shoulder of Alabama Street with demolition of existing improvements to accommodate the new trail. The project also includes new curb and gutter, storm drainage system, signing and marking, traffic control, erosion and sediment control (installation, maintenance, and removal of erosion and sediment control BMP’s), construction staging, and coordination with project engineer, project manager, city engineer, and property owners.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents