Similar Projects
Last Updated | 06/28/2021 12:56 PM |
Project Title | Alabama Street Greenbelt Spur |
Physical Address | View project details and contacts |
City, State (County) | Carrollton, GA 30117 (Carroll County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Sidewalks/Parking Lot |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Work consists of approximately 4,500 lf of 5” thick, 10’ wide concrete multi-use trail along Alabama Street. The project begins at the existing Carrollton GreenBelt trailhead near the Little Tallapoosa River and ends at 4th Street. The project will include construction of concrete trail along the north shoulder of Alabama Street with demolition of existing improvements to accommodate the new trail. The project also includes new curb and gutter, storm drainage system, signing and marking, traffic control, erosion and sediment control (installation, maintenance, and removal of erosion and sediment control BMP’s), construction staging, and coordination with project engineer, project manager, city engineer, and property owners. |
||||
Details |
|
||||
Bidder's List | View project details and contacts | ||||
Prospective Bidders | View project details and contacts | ||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |