Similar Projects
Kehrs Mill Road Retaining Wall Replacement Project
Infrastructure
Bidding
$100,000 CJ est. value
Chesterfield, MO 63017

Lackland Road Culvert C-2-116 and Lackland Road Resurfacing
Infrastructure
Bidding
$185,000 CJ est. value
Overland, MO 63114

Valley Park TCE, Operable Unit 02
Term Contract
Sub-Bidding
Valley Park, MO 63088

Gravel
Term Contract
Sub-Bidding
Chesterfield, MO 63005

As Needed On Call Sweeping Service
Term Contract
Post-Bid
Ballwin, MO 63021

District Pest Control
Alteration
Post-Bid
Kirkwood, MO

Parking Lot Sweeping Services
Term Contract
Results
Ballwin, Chesterfield, Manchester, Saint Louis, MO 63017

Bridge Washing on I-70 and Route
Infrastructure
Results
$250,000 to $500,000 est. value

Woodson Road - Ultrathin Bonded Asphalt Surface
Infrastructure
Bidding
$500,000 CJ est. value
Overland, MO 63114

FY23 (15kV EPR Cable)
Term Contract
Sub-Bidding
Kirkwood, MO 63122

On Call Glazier Services
Term Contract
Post-Bid
Saint Louis, MO

Kennedy Recreation Complex Ice Rink Maintenance and Repairs
New Construction, Infrastructure
Results
Sappington, MO 63128

Main Circle Drive Improvement Project
Infrastructure
Bidding
$400,000 CJ est. value
Chesterfield, MO 63017

Monthly Mechanical Parking Lot and Surrounding Sidewalks Cleaning Services at 4 County Locations
Term Contract
Sub-Bidding
Berkeley, MO 63134

Annual Handyman Services
Term Contract
Post-Bid
Florissant, MO

Last Updated 08/10/2022 11:11 AM
Project Title

2022 Hazelwood Tree Removal Project

Physical Address View project details and contacts
City, State (County) Hazelwood, MO 63042   (Saint Louis County)
Category(s) Heavy and Highway, Single Trades
Sub-Category(s) Maintenance, Service/Term Contracts
Contracting Method Competitive Bids
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The scope of this project is to remove 30 trees, including stumps, on various City streets throughout Hazelwood, Missouri in preparation for sidewalk replacement Please direct any inquiries to Nikki Miller, Project Development Coordinator, at mmmiller@hazelwoodmo.org or (314) 513-5031. Bidders shall include with their bids a Bid Bond, Cashiers Check or Money order in the amount of 5% of the total bid. That the "CONTRACTOR" shall furnish and maintain with the "CITY" a performance bond equivalent to 100% of the Contract Price. That the "CONTRACTOR" shall furnish and maintain with the "CITY" a payment bond equivalent to 100% of the Contract price Bids may be withdrawn prior to bid opening, but once opened, bids are to be binding for ninety (90) days following bid opening. It is hereby fully understood and agreed that time is of the essence in performance of this Contract. For each calendar day that elapses between this Contract's full completion date the date on which all work covered by this Contract is actually completed (not substantial completion, rather full completion), including all testing, clean up, punch list items and final close-out documents, the Contractor shall pay to the City as liquidated damages and not as a penalty, the sum of $150.00 per calendar day. The total amount so payable by the Contractor as liquidated damages either may be deducted from any moneys due or payable to the Contractor by the City or so much thereof as is not so deducted shall be chargeable to and will be payable promptly by such Contractor and his surety or either of them, at least in part, the City for (1) the administration of the work covered by such Contract and any other Contract or Contracts beyond the Contract completion date, including the additional expense to the City for supervision, inspection and superintendence; (2) expenditures resulting from the inability of the City (and general public) to use the improvement being constructed from and after each Contract and expenditures incurred by the City directly as a result of the failure to complete the work covered by such Contract on or before the Contract Completion Date. The City of Hazelwood reserves the right to reject any and all bids, to waive any informalities and to accept the bid that is most advantageous, beneficial or expeditious to the City of Hazelwood. No bid may be withdrawn for a period of ninety (90) days after bid opening. Bids may be corrected for clerical or typographical errors at the discretion of the City of Hazelwood, but not because of an error in judgment.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents