Similar Projects
Strategic Planning and Operational Flexibility (SPOF) Support
Term Contract
Design
Saint Marys, GA - Bangor, WA 31558

Architectural Services for Housing Kitsap
New Construction
Bidding
Silverdale, WA 98383

On-Call Geotechnical Engineering Consulting Services
Term Contract, Infrastructure
Bidding
$150,000 est. value
WA

2019 Architect/Engineer Construction Management/Inspection Support
Post-Bid
$1,000,000 to $3,000,000 est. value

2019 Architect/Engineer Construction Management/Inspection Support
Post-Bid
$1,000,000 to $3,000,000 est. value

A-E Shortlist for USDA-FS, Region 8 and 10, SRS-PNW-LITF Research Stations 2021
New Construction
Results

A-E Shortlist for USDA-FS, Region 8 and 10, SRS-PNW-LITF Research Stations 2021
New Construction
Results

Engineering Consultant Services for On-Call Geotechnical Services
Term Contract
Bidding
WA

AE Services IDIQ Recompete
Post-Bid

Electrical Engineering Services
Infrastructure
Bidding

Engineering Services for North Sound to Olympics (STO) Trail Planning Study
Infrastructure
Post-Bid
Less than $343,000 est. value

Architect-Engineer - Air Field Pavement Design MATOC
New Construction, Term Contract
Bidding

Water System Zone Intertie Design Preparation
Infrastructure
Post-Bid

Landfill Consultant Services
New Construction, Infrastructure
Bidding
Olalla, WA 98359

6th Street Pavement Preservation Phase III
Term Contract, Infrastructure
Post-Bid
Bremerton, WA 98337

Reported 10/21/2021 12:00 AM
Project Title

A/E Professional Services for Bethel Phase 1 - Street Improvement Project

Physical Address View project details and contacts
City, State (County) Port Orchard, WA 98366   (Kitsap County)
Category(s) Professional Services
Sub-Category(s) Architectural, Engineering
Contracting Method Competitive Bids.
Project Status Accepting Qualifications
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Improvements are proposed for Bethel Avenue from North of Sedgwick Road (SR160) to North of Lundeberg including intersections. The roadway will be widened to include a center median, bike lanes, planter strips, and sidewalks. Round-abouts are envisioned at Blueberry Rd., Salmonberry Rd, and Valair Ct/ Walmart.Design and Construction are expected to be phased. The first phase of construction is likely to include a round-about at the Blueberry intersection and possibly the street segment between North of Sedgwick to Blueberry.

Details

Architectural, New Construction.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents