Similar Projects
Anchorage Golf Course Cart Path Repairs
Infrastructure
Bidding
$1 to $100,000 est. value
Anchorage, AK 99507

Shageluk Airport Access Road Improvements
Infrastructure
Bidding
$5,000,000 to $10,000,000 est. value
Shageluk, AK 99665

Design-Build Services for Knutson Drive Critical Repairs
Infrastructure
Post-Bid
$800,000 est. value
Sitka, AK 99835

Design-Build Services for Knutson Drive Critical Repairs
Infrastructure
Post-Bid
$800,000 est. value
Sitka, AK 99835

Hidden Hills Road Repairs
Infrastructure
Results
Less than $110,000 est. value
Matanuska, AK

2021 Kenai Municipal Airport Airfield Drainage
Infrastructure
Results
Kenai, AK

Gravel Road Design - Duke Street, St. Andrews Road; Sports Lake Road; Hakala Drive; Cotman Court
Infrastructure
Bidding
Soldotna, AK 99669

2021 Bryson Avenue Bluff Erosion Repair
Infrastructure
Results
Kenai, AK 99611

Basargin Road Phase 3 Design
Infrastructure
Bidding
English Bay, Soldotna, AK 99669

Point MacKenzie Rail Extension Bridge Repairs
Renovation, Alteration
Results
Matanuska, AK

Seward Northeast Harbor Launch Ramp Renovation
Infrastructure
Bidding
$2,500,000 to $5,000,000 est. value
Seward, AK 99664

North Road Surfacing
Infrastructure
Results
Kenai, Seldovia, AK 99669

Trunk Road Railroad Overpass Drainage Repair
Infrastructure
Bidding
Less than $95,000 est. value
Palmer, AK 99645

Landlocked Avenue Road Repairs
Infrastructure, Alteration
Results
Matanuska, Willow, AK 99645

Cormorant Way Road Improvements
Infrastructure, Alteration
Bidding
Less than $600,000 est. value
Wasilla, AK 99654

Last Updated 09/23/2021 12:17 PM
Project Title

Earthquake Repairs - Phase I & II

Physical Address View project details and contacts
City, State (County) Whittier, AK   (Valdez-Cordova County)
Category(s) Heavy and Highway
Sub-Category(s) Dock/Pier/Marine, Paving/Reconstruction, Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,500,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Schedule A: Base Bid PW571 Harbor Parking and Harbor Road Triangle The scope of work includes crack repairs, seal coat and restriping of Harbor Parking and pavement, curb and gutter and sidewalk repairs in the Harbor Road Triangle. PW572 Ocean & City Docks Settlement Repairs The scope of work includes repairing the revetment at the Ocean Dock, repairing the Ocean Dock abutment, repairing settlement at Ocean Dock, repairing the timber abutment at City Dock, and repairing settlement at City Dock. PW573 Tidal Lagoon Slope Stabilization The scope of work includes embankment repairs to stabilize the north slope of the Tidal Lagoon. PW574 Utility Settlement, Grout & Blockage Repairs The scope of work includes settlement and grout repairs to utility manholes and valve boxes throughout town and replacing collapsed storm drains along Billings Street and Kenai Street. PW576 Breakwater Settlement Repairs The scope of work includes adding armor stone to the breakwater to correct settlement issues. PW577 Kenai Street Sink Hole Repairs The scope of work includes pavement structural section repairs to two sink holes on Kenai Street and Eastern Avenue. Schedule B: Additive Alternates – Schedule Restricted Construction Additive Alternate 1 The scope of work includes the addition or subtraction of construction costs to the Harbor Parking and Harbor Road Triangle Base Bid pay item to be completed by November 2021. Additive Alternate 2 The scope of work includes the addition or subtraction of construction costs to the Ocean & City Docks Settlement Repairs Base Bid pay item to be completed by November 2021. Additive Alternate 3 The scope of work includes the addition or subtraction of construction costs to the Tidal Lagoon Slope Stabilization Base Bid pay item to be completed by November 2021. Additive Alternate 4 The scope of work includes the addition or subtraction of construction costs to the Utility Settlement, Grout & Blockage Repairs Base Bid pay item to be completed by November 2021. Additive Alternate 5 The scope of work includes the addition or subtraction of construction costs to the Breakwater Settlement Repairs Base Bid pay item to be completed by November 2021. Additive Alternate 6 The scope of work includes the addition or subtraction of construction costs to the Kenai Street Sink Hole Repairs Base Bid pay item to be completed by November 2021.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs, Storm Drainage Structures.
Division 35 - Waterway and Marine Construction, Common Work Results for Waterway and Marine Construction, Waterway and Marine Construction and Equipment, Shoreline Protection, Waterway Construction and Equipment, Marine Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents