Similar Projects
JPMC SW Facility MRO Industrial Supplies
Term Contract
Sub-Bidding
Springfield, IL 62703

Testing and Remediation Services
Term Contract
Sub-Bidding
Springfield, IL 62703

Residential Water Service Materials
Post-Bid
Springfield, IL

Ductile Iron Pipe
Post-Bid
Springfield, IL

Miscellaneous Cutting Tools & Abrasives
Term Contract
Results

Aerial Spraying of Aquatic Glyphosate Herbicide
Term Contract
Results

Iron Fittings
Post-Bid
Springfield, IL

Klein And Mason Warehouse HVAC Renovations
Renovation, Infrastructure
Results
Springfield, IL 62702

Conservation World Portable Toilets And Hand Washing Stations
Post-Bid
Springfield, IL

Vacant Unit Painting
Renovation, Term Contract, Alteration
Results
Springfield, IL

Co Hanley Window Washing Services
Term Contract, Alteration
Post-Bid
Springfield, IL 62703

Logistics FY22 Underground Storage Tank Inspections-JTR
Alteration
Post-Bid
Springfield, IL

Co Hanley Window Washing Services
Term Contract, Alteration
Post-Bid
Springfield, IL 62703

ByProduct Hauling
Alteration
Post-Bid
Springfield, IL 62712

183d HVAC Controls Service and Maintenance
Alteration
Post-Bid
Springfield, IL 62707

Last Updated 08/04/2022 04:09 PM
Project Title

Paging System for Fire Stations

Physical Address View project details and contacts
City, State (County) Springfield, IL 62703   (Sangamon County)
Category(s) Government/Public, Single Trades
Sub-Category(s) Fire/Police Station, Service/Term Contracts
Contracting Method Competitive Bids
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Paging System for Fire Stations The City reserves the right to accept or reject any or all proposals. Bids will not be considered unless they are accompanied by bid security in the form of a certified check, cashier's check, bank draft, bank money order or a satisfactory bid bond in the sum of five percent (5%) of the base bid amount. All Contracts for the Construction of Public Works are subject to the Illinois Prevailing Wage Act. Certified Female and Minority Business Enterprises are encouraged to submit proposals for this project. The deadline to ask questions is also being extended until Wednesday, July 27, 2022 at 12:00 p.m., CST. All questions concerning this bid shall be submitted in writing to Purchasing@springfield.il.us

Details

Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Metal Doors and Frames, Wood Doors, Plastic Doors, Specialty Doors and Frames, Panel Doors, Multi-Leaf Vertical Lift Doors.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Flooring, Acoustic Treatment, Painting, High-Performance Coatings.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Toilet, Bath, and Laundry Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Wardrobe and Closet Specialties, Flagpoles, Flags and Banners.
Division 11 - Equipment, Unit Kitchens.
Division 12 - Furnishings, Countertops, Rugs and Mats.
Division 14 - Conveying Equipment, Slide Pole Systems, Firehouse Slide Poles.
Division 21 - Fire Suppression, Facility Fire-Suppression Water-Service Piping, Fire-Department Connections, Fire Pumps.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Facility Water Distribution, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Emergency Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Call Management, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents