Similar Projects
Dunham Pointe Landscape Amenities Phase 1 B
Term Contract
Bidding
TX

Construction of Sidewalks Project at Waterford, Alief 6 and Danish (Phase II), Precinct 3
Infrastructure
Bidding
Houston, TX

TIRZ 25 Sidewalk, Curb and Curb Ramp Assessment Project - West Orem Drive (Pyramid Place to Ambrose Street)
Post-Bid
Houston, TX 77002

Tirz 9 Sidewalk, Curbs and Curb Ramps Assessment Project - Buffalo Speedway (Simsbrook Drive to West Airport Boulevard)
Post-Bid
Houston, TX

Intramural Gravel Lot Conversion
Results
Houston, TX 77204

Elmside/Woodchase Path
Results
$2,900,000 to $3,300,000 est. value
Houston, TX 77042

54 Scott BOOST Construction Requirements
Infrastructure
Bidding
Houston, TX 77282

TIRZ 25 Sidewalk, Curbs, and Curb Ramps Assessment Project - South Post Oak Road (Anderson Street to US 90 ALT)
Post-Bid
Houston, TX 77002

Construction of Bay Area Hike and Bike Trail (Segment 1 - Phase 2) for Harris County Precinct 2
Results
Less than $1,133,277 est. value
Houston, TX 77002

Tirz 25 Sidewalk, Curbs, and Curb Ramps Project - Along Various Major Thoroughfares
Post-Bid
Houston, TX 77002

Construction of Pedestrian Sidewalk and Trail Improvements in the North Zone of Harris County Precinct 2
Term Contract
Results
Less than $499,819 est. value
Houston, TX 77002

Restore Driveway-Brick Paver
Post-Bid
Houston, TX

Construction of Pedestrian Sidewalk and Trail Improvements in the South Zone of Harris County Precinct 2
Term Contract
Results
Less than $499,818 est. value
Houston, TX 77002

2021 Annual Sidewalk Improvements
Post-Bid
Pasadena, TX

Construction of Sidewalks and Transit Stops on Ella Boulevard, Kuykendahl Road, and Rankin Road for Harris County Precinct 1
Results
Less than $1,378,529 est. value
Houston, TX 77002

Last Updated 12/03/2021 07:36 AM
Project Title

Hiram Clarke Bus Shelter and Crosswalk Improvements

Physical Address View project details and contacts
City, State (County) Houston, TX   (Harris County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $360,000 to $390,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Construction of bus stops and crosswalks at three intersections along Hiram Clarke Rd., including, but not limited to, demolition of existing concrete sidewalks, driveways, and curbs, demolition of existing concrete pads, saw-cutting and removal of existing roadway segments, partial demolition and re-alignment of existing medians, stormwater detention installation, roadway paving per City of Houston standards, concrete pavers at median tips, bus stop pads consisting of concrete pavers with concrete sub slabs, pre-fabricated special bus shelters, accessible pedestrian ramps, and concrete sidewalks and driveways. Work also includes temporary traffic control, temporary tree protection, traffic control pavement markings, traffic control signage, and crosswalk striping.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents