Similar Projects
Emerson Park Operational Control Center
New Construction - 16,113 SF
Design
$9,900,000 est. value
Saint Louis, MO

RFP - Planning and Development/Police Department Tenant Finish
Renovation
Bidding
$345,000 CJ est. value
Ozark, MO 65721

Fire Station 13 (FDNS 13)
New Construction
Post-Bid
Springfield, MO 65806

Design Build of a New Fire Station
New Construction
Post-Bid
Blue Springs, MO

Police Precinct 1 - St. Louis County - Rebid
New Construction, Infrastructure - 17,224 SF
Results
$9,526,000 CJ est. value
Saint Louis, MO 63103

Engine House 2 and 3
New Construction
Results
Saint Louis, Wildwood, MO 63005

Build the District's Replacement of Fire Station 2
Renovation
Post-Bid
Bates City, MO

Police Department Training Center Enclosure
New Construction
Results
MO

New Fire Station
New Construction
Post-Bid
Kennett, MO 63857

Central Cass County Fire Protection District Station 1
Renovation, Addition
Results
Harrisonville, MO 64701

Southern Jackson County Fire Protection District - Station 3
New Construction
Post-Bid
Blue Springs, MO

Fire Station 1, Fire Station 2, and Public Safety Building
New Construction
Results
Lebanon, MO

Ballwin Police Station
New Construction - 33,534 SF
Post-Bid
Ballwin, MO 63011

Fire Station No. 1 Apparatus Bay
Addition
Results
Centertown, MO 65023

Lincoln County Fire Station 2
New Construction
Post-Bid
Moscow Mills, MO 63362

Last Updated 11/15/2022 02:47 AM
Project Title

Replace Fire Station 4 - City of Columbia

Physical Address View project details and contacts
City, State (County) Columbia, MO 65202   (Boone County)
Category(s) Government/Public
Sub-Category(s) Fire/Police Station
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected June 2024
Bids Due View project details and contacts
Estimated Value $2,500,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Replace Fire Station 4 This project is in included in the City of Columbia FY 2023 Approved Budget. As of November 15, 2022, further details regarding design and construction have not been identified. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Metal Doors and Frames, Wood Doors, Plastic Doors, Specialty Doors and Frames, Panel Doors, Multi-Leaf Vertical Lift Doors.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Flooring, Acoustic Treatment, Painting, High-Performance Coatings.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Toilet, Bath, and Laundry Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Wardrobe and Closet Specialties, Flagpoles, Flags and Banners.
Division 11 - Equipment, Unit Kitchens.
Division 12 - Furnishings, Countertops, Rugs and Mats.
Division 14 - Conveying Equipment, Slide Pole Systems, Firehouse Slide Poles.
Division 21 - Fire Suppression, Facility Fire-Suppression Water-Service Piping, Fire-Department Connections, Fire Pumps.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Facility Water Distribution, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Emergency Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Call Management, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents