Similar Projects
Roofing MACC
Post-Bid

Roofing Repair and Maintenance
Post-Bid

MATOC - Army Reserve National Roofing Program (NRP)
Results
Less than $95,000,000 est. value

W.T. Brown and Elementary Melvin Honeycutt Elementary Partial Roofing Replacement Project
Results
Spring Lake, NC 28390

Right Track Group Home Roof Replacement Project
Post-Bid
Fayetteville, NC 28306

Contract for Roofing Services
Results
Fayetteville, NC

National Roofing Program (NRP) - Construction Project 15
Term Contract
Post-Bid
$1,000,000 to $5,000,000 est. value
Pope Army Airfield, NC 28308

Re-Roofing of Max Abbott Middle School
Results
Fayetteville, NC 28305

Reroofing for FTCC Horace Sisk Building
Alteration
Post-Bid
Fayetteville, NC 28303

Re-Roofing of Mac Williams Middle School
Results
Fayetteville, NC 28312

Construction of the Department of Social Services and Judge E Maurice Braswell Courthouse Roof Membrane Re-Covers
Alteration
Post-Bid
Fayetteville, NC 28301

Anne Chesnutt Middle School Soffit and Fascia Enclosure
Results
Fayetteville, NC 28314

Roof System at 539 Bragg Boulevard
Alteration
Post-Bid
Fayetteville, NC 28301

Re-Roofing of 71st High School
Alteration
Results
Fayetteville, NC 28304

Re-Roofing of Ponderosa Elementary School
Alteration
Results
Fayetteville, NC 28303

Reported 02/26/2022 12:00 AM
Project Title

Roof System at 455 Grove Street

Physical Address View project details and contacts
City, State (County) Fayetteville, NC 28301   (Cumberland County)
Category(s) Single Trades
Sub-Category(s) Roofing
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Perform pre-construction meeting to discuss set up, staging area for equipment and loading of the roof, appropriate work hours, safety and production projections. 1. Set up equipment, materials, safety lines at all roof perimeters and ground loading/dumpster area. 2. The existing downspouts are to be reused in new roof system. 3. Install pre-cut EPS flute filler insulation cover board on roof area. New insulation to be mechanically fastened through the structural purlins as per manufacturer guidelines. 4. Install eliminailers around all outside perimeters of the roof section so that manufacturer approved metal terminations may be installed. 5. Install a new 60mil TPO single ply mechanically fastened membrane through the structural purlins as per manufacturer specifications. 6. Flash all roof penetrations and perimeters according to manufacturer's standard details. 7. Add plywood to all metal panel non-draining parapet walls to make a smooth surface so they can be flashed with membrane per manufacturers specifications. 8. New TPO membrane to wrap all non-draining parapet walls prior to new metal coping being installed. 9. Custom fabricate and install new 24 gauge prefinished gravel stop edge metal at all nondraining perimeter edges. 10. Custom fabricate and install new 24 gauge metal coping at all non-draining parapet walls perimeter. 11. Custom fabricate and install new TPO clad steel drip edge at all draining gutter edge perimeters. 12. All Kynar colors to be selected by the owner from a supplied color chart. 13. Provide a 2-year contractor's workmanship warranty. 14. Provide a manufacturer's 20-year labor and material warranty upon completion and inspection of the new roofing system by an authorized manufacturer's representative. Item 3: Install pre-cut EPS flute filler insulation followed by a 1” polyisocyanurate cover board on roof area. New insulation to be mechanically fastened through the structural purlins as per manufacturer guidelines.

Details

Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents