Similar Projects
Construction Of Water System Improvements
Infrastructure
Bidding
$1,400,000 CJ est. value
Port Lavaca, TX 77979

Polyacrylamide Cationic Emulsion Liquid Polymer
Term Contract
Sub-Bidding
League City, TX 77573

Replace Low Pressure Ducts, VAV Boxes and Piping and Related Work
Renovation
Sub-Bidding
$850,000 CJ est. value
San Antonio, TX 78249

Matagorda Ship Channel, Texas, Matagorda Peninsula to Point Comfort, Pipeline Dredging
Term Contract
Post-Bid
$50,000,000 CJ est. value
Galveston, TX 77553

Telford Unit - Replace Hot Water and Steam Piping
Alteration
Post-Bid
New Boston, TX 75570

Y1da--549-19-191 Replace Isolation Valves & Correct Plumbing (Va-22-00007066)
Term Contract
Results
$1,000,000 to $2,000,000 est. value
Dallas, TX 75216

Y1da--549-19-191 Replace Isolation Valves & Correct Plumbing (Va-22-00007066)
Term Contract
Results
$1,000,000 to $2,000,000 est. value
Dallas, TX 75216

Beeline Drive Sewer Line Replacement
Infrastructure
Construction
$546,469 CJ est. value
Harker Heights, TX 76548

Hydraulic Hoses & Fittings
Term Contract
Sub-Bidding
El Paso, TX 79901

Plumbing Maintenance and Repair Services
Alteration
Post-Bid
Lufkin, TX

Building Improvements
Alteration
Results
Pearsall, TX 78061

As Needed Plumbing Services
Term Contract
Sub-Bidding
Richardson, TX 75083

Annual Contract for Plumbing Fixtures and Parts for San Antonio Airport System
Alteration
Post-Bid
San Antonio, TX 78275

Annual Contract for Plumbing Services
Term Contract
Results
Galveston, TX

Plumbing Services
Term Contract
Sub-Bidding
Denton, TX 76201

Last Updated 07/21/2023 02:01 PM
Project Title

Parvin Branch Underpass Trail

Physical Address View project details and contacts
City, State (County) Frisco, TX 75033   (Denton County)
Category(s) Single Trades
Sub-Category(s) Plumbing
Contracting Method Competitive Bids
Project Status Results, Construction start expected September 2023
Bids Due View project details and contacts
Estimated Value $1,496,972 [brand] Estimate
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

This project consists of a hike and bike trail and storm sewer infrastructure improvements. The construction of PARVIN BRANCH TRAIL will consist of grading, installation of storm sewer pipes, storm sewer manholes/junction boxes, storm sewer inlets, storm headwalls/wingwalls, concrete rip rap, rock rip rap, erosion control matting, live staking, concrete trail construction, installation of Retaining Walls, landscaping improvements, and other miscellaneous improvements. Pedestrian facilities will be constructed consisting of concrete trail along the stream banks utilizing signage, ramps/handrails, structural retaining walls, and connections to existing trails. Questions Due Date: Jul 12th 2023, 4:00 PM CDT Estimate of Probable Cost Range: $1,000,000.00 to $1,500,000.00 No bid shall be considered unless it is accompanied by a cashiers check on any state or national bank or acceptable bidders surety bond, as specified in the General Conditions, GC 2 - Award and Execution of Contract, payable unconditionally to the Owner . Bidders must submit with their bids a cashiers check in the amount of five percent (5%) of the maximum amount bid, payable without recourse to the Owner or a Bid Bond in the same amount from an approved Surety Company as guarantee that the Bidder will enter into a contract and execute bond and guarantee forms provided within ten (10) days after notice of award of contract is issued to him or her. The successful Bidder must furnish performance and payment bonds each in the amount of 100 percent (100%) of the Contract price from an approved Surety Company holding a permit from the State of Texas, to act as Surety. The cashiers check or bidders surety bond shall be in the amount of not less than five (5) percent of the award. Electronic bids will require the Bidder to provide the original signed hard copy within three (3) business days of the notification of Intent to Award. The bid guaranty is required by the Owner as evidence of good faith and as a guarantee that if awarded the Contract, the Bidder shall execute the Contract and furnish the required bonds and evidence of insurance within ten (10) days after receipt of the awarded Contract or pay the damages as set forth below. The Bidders surety bond shall be conditioned that, if the bid is withdrawn after the bids have been opened or the Contractor refuses to execute the Contract in accordance with its bid and provide the required surety bonds, the Contractor and the surety shall become liable to the Owner for the amount of the Bidders surety bond. In the event a cashiers check is submitted along with the bid, and the Contractor does not execute the Contract and provide the required surety bonds and evidence of insurance within ten (10) days after receipt of the awarded Contract, or withdraws its bid after bids have been opened, the Owner shall be entitled to the proceeds of such check. The Contractor will be required to provide a Maintenance Bond executed by a corporate surety in accordance with Article 7.19-1, Vernons Texas Insurance Code, in the amount of 100 percent of the Contract guaranteeing the prompt, full, and faithful performance of the general guaranty and warranty contained in the Contract Documents. All unit prices must be stated in both words and numerals. The Owner reserves the right to reject any or all bids and to waive any irregularities or formalities. In case of ambiguity or lack of clearness in stating the price of the bids, the Owner reserves the right to consider the most advantageous construction thereof, or to reject the bid. Unreasonable or unbalanced unit prices will be considered sufficient cause of rejection of any bid or bids. Bidders are expected to inspect the site of the Project and to inform themselves regarding local conditions and conditions under which the Project is to be done. Attention is called to the provisions of the Acts of the 43rd Legislature of the State of Texas and subsequent amendments concerning the wage scale and payment of prevailing wages. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 22 - Plumbing, Common Work Results for Plumbing.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents