Similar Projects
Small Arms Firing Range Lead Abatement and HVAC Maintenance Services
Alteration
Bidding
Gaithersburg, Rockville, MD 20879

HVAC Preventative Maintenance and Service
Post-Bid

Request for Information: Boundary Layer Wind Tunnel
Post-Bid
Bethesda, MD

Montgomery County Recycling Center Fiber Building HVAC, Ventilation and Vacuum System Installation
Results
Derwood, MD 20855

HVAC and Mechanical Equipment Preventative Maintenance and Repair Olney Readiness Center
Term Contract
Results
Less than $50,000 est. value
Gaithersburg, MD 20882

NIF 4.7T Electronics Room Air Handler & Chilled Water Coil Replacement
Post-Bid
Bethesda, MD 20814

HVAC and Mechanical Equipment Preventative Maintenance and Repair Laurel Readiness Center and FMS
Term Contract
Results
Less than $50,000 est. value
Laurel, MD 20708

Filters, Air and HVAC
Term Contract
Post-Bid
Gaithersburg, Rockville, MD 20879

Underground Chilled Water and Heating Water Piping Replacement - Phase 1 Rockville Campus
Results
Rockville, MD 20850

Gaithersburg Maintenance Facility
Term Contract
Post-Bid
Less than $50,000 est. value
Gaithersburg, MD 20878

Gaithersburg Depot Boiler Systems Replacement
Alteration
Results
Gaithersburg, MD 20877

Repair of NIST HVAC Equipment and Pumps
Post-Bid
Gaithersburg, MD

Pool Pak, Dectron, Libert, Miscellaneous HVAC Repair And Other Services
Post-Bid
Rockville, MD

Annual Service Contract for Freezers, Refrigerators, and ULT Freezers
Post-Bid
Gaithersburg, MD 20878

Dust Collector
Post-Bid
Gaithersburg, MD 20899

Reported 09/16/2021 12:00 AM
Project Title

NSAB 16 Chillers 3 Through 9

Physical Address View project details and contacts
City, State (County) Bethesda, MD 20814   (Montgomery County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value $12,057,988
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The projects key components include: ? Demolition of the existing chillers 3-9, the associated piping and valves, and their dedicated primary pumps. ? Replacement of chillers 3 through 9 with 1500 ton centrifugal chillers utilizing eitherR-513A, R-514A or R-1233zd refrigerant ? Replacement of the 7 dedicated primary pumps (pump, motor, valves and strainer) for each of the new chillers, existing VFDs to be reused unless pump horsepower ratings change as a result of chiller selection. ? Replacement of the 4160V starters for each of the 7 chillers with solid state starters. ? Full depth repair of approximately 680 square feet of concrete slab in area A (in the vicinity of chillers 1a-6). ? Patching of slab soffit and concrete wall in area B (in the vicinity of chillers 7- 9). ? Replacement of the existing refrigerant monitoring systems with a new system capable of monitoring levels of R-123 and R-134a for the existing chillers as well as R-513A, R-514Aand R- 1233zd depending on the new chillers provided. ? Integrating the new chillers and control devices with the current Trane Tracer Controls system. ? Critical sequencing of construction as there must be enough chillers in service to meet the cooling demand at all times. ? Construction sequencing so that either chiller 7 or 8 and its primary pump is always available to run in order to maintain a chiller and its primary pump on the emergency generator circuit.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents