Similar Projects
Razing of 13 W. Montello Street and 15 W. Montello Street
Demolition, Infrastructure
Bidding
$80,000 CJ est. value
Montello, WI 53949

2022/2023 Project Cycle Local Road Improvement Program
Infrastructure
Post-Bid
$300,000 est. value
Montello, WI 53949

2022/2023 Project Cycle Local Road Improvement Program
Infrastructure
Post-Bid
$300,000 est. value
Montello, WI 53949

Village of Westfield Kerst and 7th Street Reconstruction
Infrastructure
Results
$468,911 CJ est. value
Westfield, WI 53964

Village of Westfield Kerst and 7th Street Reconstruction
Infrastructure
Results
$468,911 CJ est. value
Westfield, WI 53964

Twin Valley Road Improvements Governor Dodge State Park
Infrastructure
Construction
$1,790,500 CJ est. value
Middleton, WI 53562

Twin Valley Road Improvements Governor Dodge State Park
Infrastructure
Construction
$1,790,500 CJ est. value
Middleton, WI 53562

Paving Work on 26th Avenue (Swamp Road)
Infrastructure
Post-Bid
$80,000 est. value

Hot Oil Chip Sealing
Infrastructure
Results
$40,000 est. value
Oxford, WI

Ditch Cleaning, Replacing 21 Driveway Culverts, to include Fill and Gravel, on East Silver Springs Drive
Infrastructure
Post-Bid
$2,000,000 CJ est. value
Neshkoro, WI 54960

Road Improvement
Infrastructure
Post-Bid
$85,000 CJ est. value
Oxford, WI 53952

Last Updated 02/16/2024 05:32 PM
Project Title

CTH D Causeway

Physical Address View project details and contacts
City, State (County) Packwaukee, WI 53949   (Marquette County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Shoreline/Erosion/Drainage, Site Development
Contracting Method Competitive Bids
Project Status Results, Construction start expected March 2024
Bids Due View project details and contacts
Estimated Value $1,774,206 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Description: The work includes raising the grade of the CTH D causeway across Buffalo Lake in Marquette County. The CTH D roadway will be reconstructed for approximately 1800-ft from the bridge south of Lake Street to Freedom Road. Project work includes pulverizing asphalt, excavation, lightweight fill comprised of wood chips, salvaged materials, select borrow, base aggregate dense, HDPE culvert pipes, sheet piling shoring, riprap, erosion control, restoration, and other miscellaneous items in conformance to the Contract Documents. Finishing work including asphalt, shouldering, and pavement markings will be done by county forces after completion of this project. Site Directions: Causeway project located on CTH D between Lake St. and Freedom Rd. in town of Packwaukee. Est. Completion Date: Oct. 1, 2024 Questions received less than two days prior to the date for opening of Bids may not be answered. Question Deadline 02/13/2024 All questions about the meaning or intent of the Bidding Documents are to be submitted to Engineer. Interpretations or clarifications considered necessary by Engineer in response to such questions will be issued by Addenda to all parties recorded by Engineer as having received the Bidding Documents. Questions received less than two days prior to the date for opening of Bids may not be answered. Only questions answered by Addenda will be binding. Oral and other interpretations or clarifications will be without legal effect.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 34 - Transportation, Operation and Maintenance of Transportation.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents