Similar Projects
Wastewater Pump Station Improvements
Post-Bid
Less than $600,000 est. value
Stewartstown, NH

Derryfield Pump Station Improvements
Results
Manchester, NH

Madbury Backwash Tank and Pump Station Upgrade
Renovation
Results
Less than $2,200,000 est. value
Madbury, NH 03801

Webster Stream Intake
Construction
Center Barnstead, NH

Library Street Sewer Replacement and Suncook Pond Pump Station and Force Main
Results
Less than $1,500,000 est. value
Allenstown, NH 03275

Pump Station No. 1 Improvements, Foster St Generator Replacement, Phase 1A Septage Improvements
Results
Less than $2,200,000 est. value
Plymouth, NH

Drummer Hill Pump Station Replacement
Results
Keene, NH

Hannah Dustin Pump Station Upgrades
Results
Less than $425,000 est. value
Concord, NH 03301

Water Pollution Control Facility Ejector Station and Remote Pump Station Upgrades
Renovation
Results
Less than $402,000 est. value
Berlin, NH

Water Treatment Plant Finished Water Pump Station Project
Results
Less than $5,000,000 est. value
Concord, NH

2020 Prospect Booster Station Piping Upgrade
Results
Lebanon, NH 03766

Waste Water Treatment Facility Phase III Upgrade
Results
Less than $16,780,000 est. value
Merrimack, NH

Route 11 Pump Station Upgrade
Results
Rochester, NH

Southern New Hampshire Regional Water Project - Contract P2 - East Road Pump Station
Results
Plaistow, NH

Federal Street Pump Station Upgrade
Results
Less than $175,000 est. value
Hudson, NH 03051

Last Updated 07/21/2021 09:12 AM
Project Title

Martell Court Pump Station Headworks Upgrades

Physical Address View project details and contacts
City, State (County) Keene, NH 03431   (Cheshire County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,225,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Martell Court Pump Station Headworks upgrade project consists of installation of a new multi-rake screen and open channel grinder. A building addition is being provided for housing a screenings dumpster. Heating/ventilation/plumbing and electrical upgrades are included in the wet well side of the pump station. The base bid consists of the following: 1. Erosion control measures, sitework, yard piping, LP tank pad, and restoration. 2. New building addition for the screenings dumpster. 3. Interior building demolition and renovations for the screenings room, upper and lower level. 4. Removal of the existing sewage grinders and control panels. 5. New multi-rake screen (304 SS) and washer/compactor (304 SS) with control panel. 6. New open channel grinder. 7. Heating and ventilation upgrades for the new addition, and screenings room. 8. Electrical upgrades for the new addition and screenings room. Additional Bid Alternate No. A1 includes changing the material of the screen and washer/compactor from 304 to 316 SS.

Details

Lift and Pump Stations, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents