Last Updated 09/09/2021 09:53 AM
Project Title

Windhaven Parkway Drain Installation

Physical Address View project details and contacts
City, State (County) The Colony, TX   (Denton County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $74,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The scope of work consists of the installation of approximately 1700 linear feet of 18” edge drain along the north curb line of the west bound lane of Windhaven Parkway. Also included is approximately 40 linear feet of 6” HDPE pipe installation by horizontal directional drilling and approximately 30 linear feet of 6” HDPE pipe used to transition from the edge drain to connections to existing storm inlet boxes and any other work deemed necessary by the City of The Colony. All of the above shall be done in accordance with TxDOT and NCTCOG specifications with the City of the Colony’s Addenda and as per instructions of the City of The Colony City Engineer. All construction sequencing and barricading will be done according to the City of The Colony Standards. The opinion of probable construction cost for the overall project is $74,000.00.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents