Similar Projects
Utilities - SH 132
Infrastructure
Design
$500,000 est. value

Resurface - SH 199
Infrastructure
Design
$5,808,466 CJ est. value
Ardmore, OK 73401

USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

RFQ D/B - KC-46A 3-Bay Maintenance Hangar at Tinker AFB, Oklahoma
New Construction, Infrastructure
Post-Bid
$150,000,000 CJ est. value
Oklahoma City, OK 73145

RFQ D/B - KC-46A 3-Bay Maintenance Hangar at Tinker AFB, Oklahoma
New Construction, Infrastructure
Post-Bid
$150,000,000 CJ est. value
Oklahoma City, OK 73145

Joint Seal / Repair
Infrastructure
Results

Slabjacking and Subsealing Services
Infrastructure
Results

Bridge and Approaches - US 77
Infrastructure
Design
$1,247,400 CJ est. value
Ardmore, OK 73401

Utility Relocation Gate Valves
Infrastructure
Post-Bid

Major Street Improvements
Infrastructure
Results
Ardmore, OK

Grade, Drain and Surface - SH 53A
Infrastructure
Design
$1,110,183 CJ est. value
Springer, OK 73458

Hangar Storm Sewer Improvements
Infrastructure
Post-Bid
$420,000 CJ est. value
Ardmore, OK 73401

Grade, Drain, Surface, and Bridge SH-53: From 6.4 Miles West of the I-35 Junction, Extend East Near Springer. Project Length 6.029 Miles
New Construction, Infrastructure
Results
OK

Bridge and Approaches - SH 199
Infrastructure
Design
$2,300,000 CJ est. value
Ardmore, OK 73401

Last Updated 12/21/2022 05:01 PM
Project Title

8th Street NW Roadway & Storm Sewer Improvements

Physical Address View project details and contacts
City, State (County) Ardmore, OK 73401   (Carter County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Results, Construction start expected December 2022
Bids Due View project details and contacts
Estimated Value $2,588,500 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The purpose of the project is to fully reconstruct 8 th Street NW with new asphalt concrete, and install an associated storm sewer system from R Street NW to M Street NW in the City of Ardmore. Each Bid must be accompanied by a BID BOND payable to the OWNER for Five Percent (5%) of the total amount of the BID. A certified check may be used in lieu of a BID BOND. PERFORMANCE, MAINTENANCE AND STATUTORY PAYMENT BONDS in the amount of 100 hundred percent (100%) of the Contract Price, with a corporate surety approved by the OWNER, will be required for the faithful performance of the contract. The OWNER may waive any informalities or minor defects or reject any and all BIDS. Any BID may be withdrawn prior to the above scheduled time for the opening of BIDS or authorized postponement thereof. Any BID received after the time and date specified shall not be considered. No BIDDER may withdraw a BID within sixty (60) calendar days following the actual date of the opening thereof.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents