Similar Projects
Last Updated | 04/29/2021 10:33 AM |
Project Title | Cold Milling Bituminous Pavement |
Physical Address | View project details and contacts |
City, State (County) | West Jordan, UT (Salt Lake County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Paving/Reconstruction |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | All work shall be in compliance with the 2017 Edition of APWA specifications. Refer to Section 32 01 16 71 Cold Milling Asphalt Paving. Staff estimates that the milling and sweeping operation will be mobilized an estimated (10) times this season between April 2021 and October 2021. The milling machine shall have the ability to directly load the Citys 10-wheelers and bobtail trucks. The asphalt millings shall remain the property of the City of West Jordan. The milling machine shall mill the existing pavement to smooth out irregularities or to lower surface elevation for future overlay construction. The City of West Jordan will provide traffic control for the milling operation. The milling machine operator and sweeper operator shall halt their operation immediately and notify the City of West Jordan Streets Superintendent if there are any deficiencies in the traffic control and have those issues appropriately addressed/corrected, prior to continuing their operation. The City of West Jordan will provide notifications to the neighborhood. The City of West Jordan will provide tree pruning in accordance with the Citys Municipal Code. The milling operator shall meet cross slopes and depth of milling as directed by the Streets Superintendent. Streets shall be swept by Contractor immediately following the asphalt milling operation, prior to an asphalt overlay and following said overlay. Streets shall be swept clean of all loose asphalt and debris. Contractor will be responsible to dispose of material picked up in the sweeping process. Contractor shall provide traffic control/barricades, etc. for any of their equipment left at the site overnight. The contractor is liable for any property damage due to loose material on the pavement surface, vertical cuts, drop-offs, etc.The lowering of utilities will be performed by others. The milling operator shall not disfigure adjacent work or existing surface improvements by accidentally cutting into them if such disfigurements take place, restoration shall be the responsibility of the cold milling Contractor. A project Site hydrant will be available for use at no additional cost to the contractor. Contractor shall be responsible for any equipment needed to supply water for their equipment if they are not able to use the water provided at the hydrant meter location. |
||||||
Details |
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
![]() Engineered Spec Sheet ![]() Architectural Plans ![]() Other Documents |