Similar Projects
Control Building Electrical Upgrades
Alteration
Bidding
Island Lake, IL

PAV HA 6th Floor Lab - RO System Upgrade BP-02 (GC)
Alteration
Bidding
Lexington, KY 40506

Multi-Tiered Guaranteed Savings Contract
Term Contract
Post-Bid
Grayslake, IL 60030

Switchgear Testing and Maintenance
Post-Bid
Lake Bluff, IL 60044

Filter Rehabilitation & Generator Replacement
Results
Zion, IL 60099

2019 Passage Field Elements
Results
Green Oaks, Libertyville, IL 60048

Annual Maintenance of Electrical Systems
Term Contract
Bidding

Electrical/Solar Plan Review and Inspection Services
Post-Bid
Waukegan, IL

Route 45 Pump Station Standby Generator
Results
Libertyville, IL 60048

Purchase of (2) Portable Allmand Generators for the Department of Public Works
Post-Bid
IL

Belvidere Health Center Generator and Lighting Renovations
Results
Waukegan, IL

Electronic Filing System
Post-Bid
North Chicago, IL - Baltimore, MD - Lansing, MI - Columbus, OH - El Paso, TX 60064

Belvidere Healthe Center Generator and Lighting Renovations for the Lake
Results
Waukegan, IL

Public Works Light and Sign Materials
Post-Bid
Park City, IL 60085

Site Sign Electrical and Site Lighting Replacement Intent
Results
Grayslake, IL

Reported 08/25/2021 12:00 AM
Project Title

Heather Ridge Water Tower Standby Generator

Physical Address View project details and contacts
City, State (County) Gurnee, IL   (Lake County)
Category(s) Single Trades
Sub-Category(s) Electric
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The project includes the installation of the following: 18 kVA natural gas generator with enclosure, automatic transfer switch with built-in load center, concrete pad and rewiring the existing electrical circuitry into the new load center. Also installation of a 30 amp main disconnect with ten (10), fifteen (15) amp individual breakers installed in a new load center with cover and correctly mounted to the wall so that the panel is level and plumb. All breakers shall be clearly labeled. This project also includes the removal of an existing load center, manual transfer switch, etc. that shall be returned to the Village.

Details

Division 26 - Electrical, Packaged Generator Assemblies.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents