Reported | 08/25/2021 12:00 AM |
Project Title | Heather Ridge Water Tower Standby Generator |
Physical Address | View project details and contacts |
City, State (County) | Gurnee, IL (Lake County) |
Category(s) | Single Trades |
Sub-Category(s) | Electric |
Contracting Method | Competitive Bids. |
Project Status | Request for Proposals (RFPs) |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The project includes the installation of the following: 18 kVA natural gas generator with enclosure, automatic transfer switch with built-in load center, concrete pad and rewiring the existing electrical circuitry into the new load center. Also installation of a 30 amp main disconnect with ten (10), fifteen (15) amp individual breakers installed in a new load center with cover and correctly mounted to the wall so that the panel is level and plumb. All breakers shall be clearly labeled. This project also includes the removal of an existing load center, manual transfer switch, etc. that shall be returned to the Village. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |