Similar Projects
Access Road Rehabilitation, Marianna Municipal Airport
Bidding
Marianna, FL 32447

Marianna Site Paving Phase 3
Bidding
Marianna, FL 32448

M.L. King Street Paving
Post-Bid
Jacob City, FL

Paving Project at Apalachee Correctional Institution
Post-Bid
Sneads, FL 32460

FEMA Project 6
Results
Less than $353,885 est. value
Marianna, FL

Design and Performance of Open-Graded Friction Course (OGFC) Mixtures Containing Epoxy Asphalt
Results

Pavement Markers: Raised and Reflectorized and Related Materials (Supplemental Bid)
Term Contract
Results

Jackson Road from Woodrest Road to End Pavement
Results
Marianna, FL

Safety Project
Results
est. value

Road Grading/Maintenance
Results
FL

Lakepoint Drive Emergency Culvert Replacement Project
Results
Marianna, FL

Dothan Street Resurfacing
Results
Less than $150,000 est. value
Campbellton, FL 32426

Milling and Resurfacing
Results
Less than $1,500,000 est. value

Widen/Resurface Exist Lanes
Results
Less than $1,901,426 est. value
FL

Drainage
Results
Less than $500,000 est. value

Last Updated 07/24/2019 03:28 PM
Project Title

3rd Avenue Paving and Drainage Improvement Project

Physical Address View project details and contacts
City, State (County) Alford, FL 32420   (Jackson County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $482,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description This project consists of the widening and resurfacing of 3rd Ave. from Arizona Street to US 231 in Alford Florida for a total project length of 0.43 miles. Also included are isolated reconstruction areas of the existing roadway. Drainage improvements will be included consisting of ditch grading and cross drain and side drain pipe replacement. Signing and pavement markings are also included including the placement of thermoplastic markings on the final surface and the addition of a striped pedestrian crosswalk at the US 231 intersection. Bidders must be FDOT Prequalified
Details
Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs, Storm Drainage Structures.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents