Similar Projects
New Gymnasium for Los Alamos Middle School
New Construction - 20,000 SF
Conception
$7,000,000 to $12,000,000 est. value
Los Alamos, NM 87544

Eldorado High School New Title IX PE/Gym Wing
New Construction
Conception
$33,600,000 est. value
Albuquerque, NM 87111

Z--BIE/Nmns/Fm/Install New TPO Roofing Exs
Term Contract
Design
Fort Wingate, NM

Refurbish and Oil All Wood Siding, Decks, Trim, Eaves, and Fascia of Two Cabins
Renovation
Design
$80,000 CJ est. value
Eagle Nest, NM 87718

RFQ Design - Architectural Services Van Buren Middle School
Renovation
Bidding
$2,000,000 CJ est. value
Albuquerque, NM 87108

Roof Renovation Project
Post-Bid
NM 87034

Roofing Contractor on Demand
Infrastructure
Post-Bid
Less than $1,000,000 est. value
Rio Rancho, NM

Gadii`Ahi Chapter Community Center
Results
Shiprock, NM 87420

Roofing IDIQ- Plains Area - South
Results
$2,000 to $3,000,000 est. value

Daniel Fernandez Youth Center - Phase IV Addition
Addition - 19,642 SF
Construction
Los Lunas, NM 87031

Indoor Sports Complex
New Construction
Pending Verification
$2,250,000 est. value
Albuquerque, NM

South West Community Facility
Renovation, Addition
Pending Verification
$2,000,000 est. value
Albuquerque, NM

Roof Repairs Group 1 Buildings 163, 1624, and 1776
Renovation
Design
$5,000,000 CJ est. value
White Sands Missile Range, NM 88002

Sunrise Elementary School Partial Re-Roof - 2021
Alteration
Post-Bid
$475,000 est. value
Chaparral, NM 88081

DACC Alex Sanchez Roof Coatings
Results
Las Cruces, NM 88003

Last Updated 08/15/2022 05:32 AM
Project Title

Gymnasium Roof Repair

Physical Address View project details and contacts
City, State (County) Coyote, NM 87012   (Rio Arriba County)
Category(s) Entertainment/Recreation, Single Trades
Sub-Category(s) Athletic Facility, Roofing
Contracting Method Competitive Bids
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $712,000 [brand] Estimate
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

For more information on submitting a Bid, visit owner website . It is the responsibility of the Offeror to ensure that proposals are delivered on time to the correct address. Access the roof with ladders at the front of the building. To avoid crew using roof hatch or inside of building. Set up a safety line where parapets are low. Tear off the existing membrane only and adhere a 0115 mil TPO Fleeced back. membrane over the existing insulation. The existing insulation is in good condition and will remain. White membrane is highly reflective and will be noticed in your heating and cooling. below. New roof membrane will be 100% adhered Terminate the base flashing up the parapet under the existing metal flashing. 1102. lineal feet. Base flashing will terminate under a new metal coping cap. 630 lineal feet. Flash all roof drains and use water block between the drain bowl and drain ring and sandwich the membrane to achieve a watertight termination. Lash all pipes with TPO preformed pipe boots with claps and caulking. 12 totals. Sizes vary. Flash all curbs, pipes, drains, scupper etc. per the manufactures detail and specs. Put down a protective walk pad from roof hatch to the ladder only. Approx. 40 lineal feet. Replace all skylights to match existing with fall protection screen. Include a crane/lift to load all materials onto the roof Permit. Provide a manufacture's Warranty. All warranty fees to be included, 15-year manufactures' warranty, 2-year installers warranty, All roofing related debris is to be cleaned daily and hauled away or put in trash bags and dumpsters, All per diem for our crew while working on building, Roof drains above Board Room needs to be cleaned and opened up for clear drainage

Details

Division 01 - General Requirements, Construction Facilities.
Division 03 - Concrete, Concrete Forming, Concrete Accessories, Cast-in-Place Concrete, Precast Concrete.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings.
Division 09 - Finishes, Painting.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 31 - Earthwork, Site Clearing, Earth Moving.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Athletic and Recreational Surfacing, Fences and Gates.
Division 33 - Utilities, Water Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents