Similar Projects
Lake Powell Pipeline - State of Utah
Infrastructure
Conception
$1,800,000,000 CJ est. value
Washington, UT 84780

1130 North Drainage Improvements - City of Saint George
Infrastructure
Conception
$1,400,000 CJ est. value
St George, UT 84770

White Dome Commercial
New Construction, Infrastructure - 30,000 SF
Design
$8,000,000 CJ est. value
St George, UT 84770

Monopole Tower
New Construction, Infrastructure - 100 SF
Design
$53,700 CJ est. value
St George, UT 84770

Delta by Marriott
New Construction - 140,000 SF
Post-Bid
$20,000,000 to $25,000,000 est. value
Saint George, UT 84770

Buena Vista Boulevard Green Springs Drive to Cactus Lane
Term Contract
Post-Bid
Washington, UT

3000 E Widening / Drainage (2000 S To 1580 S)
Infrastructure
Results
Saint George, UT 84790

SR 59 - Shoulder Widening
Infrastructure
Results
$1,500,000 to $3,000,000 est. value
UT

Black Desert Resort
New Construction
Construction
Ivins, UT

Black Desert Resort
New Construction
Construction
Ivins, UT

Lugano Landing (PA-4) at Divario
New Construction, Infrastructure
Pending Verification
$49,000,000 CJ est. value
St George, UT 84770

La Verkin Holiday Inn
New Construction
Pending Verification
La Verkin, UT

Bloomington Pickleball Courts - City of Saint George
Infrastructure
Conception
$1,174,041 CJ est. value
St George, UT 84790

Waters Edge at Desert Color
New Construction, Infrastructure
Design
$17,000,000 CJ est. value
St George, UT 84790

Toquerville Parkway Project
New Construction, Infrastructure
Post-Bid
Toquerville, UT

Last Updated 04/27/2023 02:03 PM
Project Title

Sand Hollow Resort

Physical Address View project details and contacts
City, State (County) Hurricane, UT 84737   (Washington County)
Category(s) Commercial, Heavy and Highway
Sub-Category(s) Hotel/Motel, Paving/Reconstruction, Site Development
Contracting Method Bids by Invitation
Project Status Occupancy, Construction start expected February 2022
Bids Due View project details and contacts
Estimated Value $125,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

As of April 19, 2023, construction is complete.

Details

New Construction, New Construction.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete, Precast Structural Concrete, Precast Concrete Slabs.
Division 04 - Masonry, Unit Masonry, Concrete Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances and Storefronts, Windows, Mirrors.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Flooring, Resilient Flooring, Carpeting, Wall Coverings, Acoustic Treatment, Painting.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Flagpoles.
Division 11 - Equipment, Commercial Laundry and Dry Cleaning Equipment, Maintenance Equipment, Ice Machines, Cleaning and Disposal Equipment.
Division 12 - Furnishings, Window Blinds, Curtains and Drapes, Casework, Furnishings and Accessories, Hospitality Furniture.
Division 21 - Fire Suppression, Water-Based Fire-Suppression Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Facility Water Distribution, Facility Sanitary Sewerage, Plumbing Equipment, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution, Central Heating Equipment, Central Cooling Equipment.
Division 26 - Electrical, Medium-Voltage Electrical Distribution, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Voice Communications, Call Management.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Planting Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents