Similar Projects
Z--Rehabilitate Parking Area, Ruby Beach
Term Contract, Infrastructure, Alteration
Design
$500,000 to $1,000,000 est. value
Port Angeles, WA 98362

Stormwater Repairs Phase III Construction
Alteration
Design
$5,200,000 est. value
WA

Pine Road Basin Stormwater Improvements Project
Infrastructure
Bidding
$2,800,000 to $3,100,000 est. value
Bremerton, WA 98310

2022 Storm Pipe Repair Project
Infrastructure
Bidding
$210,000 est. value
Federal Way, WA

Sewer Outfall Replacement
Infrastructure
Post-Bid
$1,500,000 to $2,000,000 est. value
Friday Harbor, WA 98250

Friday Harbor Labs Sewer Repair
Renovation, Alteration
Post-Bid
$160,000 to $200,000 est. value
Friday Harbor, WA 98250

Stratford Lane Step to Gravity Conversion
Infrastructure, Alteration
Results
$220,878 est. value
Olympia, WA

Ostrich Bay Creek Stormwater Treatment
Infrastructure, Alteration
Results
$1,000,000 to $1,300,000 est. value
Bremerton, WA

Stormwater for Washington Basin - Knox Avenue
Infrastructure
Bidding
$1,000,000 to $1,800,000 est. value
Spokane, WA

Environmental Consulting Services for 2021 Stormwater Code Amendments
Renovation, Alteration
Post-Bid
$75,000 est. value
Sammamish, WA 98075

Engineering Services for Parking Lot And Trailhead Development & Stormwater Management Plan
New Construction, Infrastructure
Results
Blaine, WA 98230

Madison Combined Sewer Separation
Infrastructure
Bidding
$3,200,000 est. value
Monroe, WA

Stromwater Operations and Maintenance
Alteration
Post-Bid
Port Orchard, WA 98366

Louis Thompson Tightline
New Construction, Infrastructure
Results
$5,800,000 est. value
Sammamish, WA 98074

Bioretention and Water Quality Treatment
Infrastructure, Alteration
Bidding
$73,000 to $90,000 est. value
Kirkland, WA 98033

Last Updated 05/27/2022 12:21 AM
Project Title

Ohrt's Addition Storm Drain Retrofit

Physical Address View project details and contacts
City, State (County) Kennewick, WA   (Benton County)
Category(s) Sewer and Water
Sub-Category(s) Storm/Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $520,000 to $575,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project involves storm drainage improvements to address drainage and flooding issues located within Ohrt's Subdivision. Said improvements will more specifically occur on W. 37th Ave., S. Buntin Loop, S. Waverly St., and S. Anderson St. Work will consist of the installation of 10-inch, 12-inch, and 18-inch storm drain mainlines, storm drain structures, and service lines along with modifications to existing drywells and one manhole. Also included will be the removal of existing catch basins and storm service pipes.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents