Similar Projects
Sleepy Farms Wastewater Collection System
Infrastructure
Post-Bid
$2,183,997 est. value
NM

Vado Lift Station #7 Improvements
Renovation
Post-Bid
$1,690,000 est. value
NM

Valle Del Rio Water System Improvements
Results
La Mesa, NM

Jacquez Road Line Extension
Results
$99,856 est. value
La Mesa, NM 88021

Metro Verde Lift Station
Results
Las Cruces, NM 88004

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Results

Water and Wastewater Systems Maintenance and Repair Services
Results
Las Cruces, NM 88007

Water Service Line and Patch Replacement
Results
$309,870 est. value
Las Cruces, NM 88004

3358 Housing Warehouse Lift Station Removal
Results
Las Cruces, NM 88003

Water Main Rehabilitation Carreon Place and Alley
Results
$769,205 est. value
Las Cruces, NM 88004

Placitas Water System Improvements
Results
Las Cruces, NM

Solarridge Waterline and Pavement Replacement
Results
Las Cruces, NM

Y--NM-Valle De Oro NWR-Water Control Wetland 1 & 2 On
Term Contract
Results
Albuquerque, NM 87105

Lower Rio Grande Public Water Works Authority Vado Water System Improvements
Infrastructure
Results
La Mesa, NM

Vista Del Rey Estates MDWCA Water System Improvements
Infrastructure
Results
Las Cruces, NM

Reported 03/03/2022 12:00 AM
Project Title

Village Lift Station and Forcemain Rehabilitation

Physical Address View project details and contacts
City, State (County) NM   (Dona Ana County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations, Water Lines
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value $2,400,000
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The project will include installation of a new C-900 and Ductile Iron 12" forcemain with isolation valves, air/vacuum relief valves, connections, ancillary piping, bores, surfacing replacement. Additionally, lift station improvements including replacement of submersible pumps, drop pipes, valves, guide rails, chains, coatings and concrete restoration, hatch and concrete lid, vent, packaged biological odor control system, flow meter, electrical component replacements and upgrades. Alternative 1 manhole rehabilitation includes cleaning, restoration and epoxy coating.

Details

Lift and Pump Stations, Renovation.
Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents