Last Updated | 03/16/2023 11:33 AM |
Project Title | Westland Township 2023 FDR Project |
Physical Address | View project details and contacts |
City, State (County) | New Concord, OH 43762 (Muskingum County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Maintenance, Paving/Reconstruction, Site Development |
Contracting Method | Competitive Bids |
Project Status | All Bids Received, Results Expected, Construction start expected April 2023 |
Bids Due | View project details and contacts |
Estimated Value | $200,000 [brand] Estimate |
Plans Available from | Municipal Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Cabin Hill Road is to be done from the intersection of US-22/US-40 and Cabin Hill Road to the AdamsTownship/Westland Township line. Clagett Road - 1.41 miles, width 18' Clagett Road is to be done in its entirety. Moore's Lane - 0.2 miles, width 18' Moore's Lane is to be done from the intersection of US-22/US-40 and Moore's Lane to the intersection of Moore's Lane and Wakefield Drive. Item #1 A 2" layer of #304 limestone will be placed on the existing roadways, then a full depth reclamation of 8" to 10" shall be performed. The #304 limestone is to be supplied by and hauled by the contractor. The contractor shall provide all other equipment, labor, materials, and traffic control to complete the project. Item #2 Chip seal prime coat MC-70 [or approved equivalent]. To include material (MC-70)applied at an application rate of 0.3 gallons per square yard, equipment and labor to place prime coat on top of reclaimed surface. Cover aggregate to be supplied, hauled, placed and rolled by the contractor. The Contractor shall provide all other equipment, labor, materials, and traffic control to complete the project. Item #3 Chip seal coat MC-3000 [or approved equivalent]. To include material (MC-3000) applied at an application rate of 0.3 gallons per square yard, to place seal coat on top of prime coat. Cover aggregate [ODOT approved #8's limestone] to be supplied, hauled, placed and rolled by the contractor. The contractor shall provide all other equipment, labor, materials, and traffic control to complete the project. Rollers shall conform with Item 422.03 of the 2019 ODOT CMS manual. Use type II pneumatic tire rollers conforming to 401.13. Project completion prior to October 31, 2023 The board of Trustees reserves the right to waive any technicalities in the bidding, to reject any or all bids, and to enter into a contract with the bidder who, in their consideration, offers the best proposal. |
||||
Details |
|
||||
Bidder's List | View project details and contacts | ||||
Prospective Bidders | View project details and contacts | ||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |