Similar Projects
Buildings and Grounds Maintenance Services, Mahoning Creek Lake
Design
New Bethlehem, PA 16242

23 SC Herbicide SGL 49, 97, 104 PR 4-7
Alteration
Bidding
PA

Mowing and Tree Clearing
Alteration
Bidding
Moon, PA

Grass Cutting Services
Term Contract
Post-Bid
Bethlehem, PA 18017

Mowing and Lansdcaping of School Grounds
Post-Bid
Oxford, PA 19363

F--INDE - Tree Maintenance Services
Results
$35,000 to $400,000 est. value
Philadelphia, PA 19106

Debris and Tree Removal
Results
Less than $24,750 est. value
Orangeville, PA 17859

Quill Pen Tree Felling Project SGL 158
Alteration
Bidding
PA

City Cuts 2020
Post-Bid
Pittsburgh, PA 15219

Tree Removal Services
Results
Phoenixville, PA

SGL 029 Crop Tree Stem Injection Herbicide Project
Alteration
Bidding
PA

23SE-SGL156 Herbicide PR6-20 Project
Post-Bid
PA

NW Hack and Squirt Herbicide SGL 086
Results
PA

Competing Vegetation Removal 20-8 FD 4, 6 and 15
Post-Bid

Morris Road Improvements - Cedarbrook Avenue to South Devon Avenue
Results
Wayne, PA 19087

Last Updated 06/28/2021 03:47 PM
Project Title

Herbicide spraying for Norther Area Dams

Physical Address View project details and contacts
City, State (County) Prompton, PA   (Wayne County)
Category(s) Single Trades
Sub-Category(s) Landscaping/Irrigation
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Performance Work Statement Spraying of Herbicide at Prompton, Jadwin, Beltzville and Francis E. Walter Dams, PA Introduction Background. The US Army Corps of Engineers Philadelphia District has 5 multipurpose flood control projects located within the Delaware River Basin. While operating and maintaining these earth fill structures, it is critical to manage the spread of unwanted woody vegetation on the dam’s critical areas. This contract will service 4 of the 5 projects including Beltzville Dam, Lehighton PA, Francis E. Walter Dam, White Haven PA, General Edgar Jadwin Dam, Honesdale PA, and Prompton Dam, Prompton PA. Scope of Work. Every two years, the Northern Area Dams require a contracted herbicide spraying program to effectively control woody vegetation on the site’s embankments, groins, abutments, and 15ft beyond all contact points. This helps ensure the integrity of the earth filled structure. This program also serves as a way to control invasive plant species and the spread of unwanted phragmites while aiding to reduce maintenance efforts at each project. General Requirements A herbicide spraying contract shall be provided at Beltzville Dam, Francis E. Walter Dam, General Edgar Jadwin Dam, and Prompton Dam (hereafter referred to as “dams”) as described in the following sections. General. The Contractor agrees to furnish services as described in Section 3, Performance Requirements. This contract will cover the period beginning 1 June 2021 through 15 July 2021. Government-Furnished Materials. The Contractor is expected to provide all manpower, equipment, supplies, and materials required to deliver the herbicide spraying service.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Irrigation, Planting Irrigation, Planting, Planting Preparation, Soil Preparation, Landscape Grading.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents