Similar Projects
Token Creek Park Road Repave
Infrastructure
Bidding
Deforest, WI 53532

Traffic Calming Improvements
Renovation
Post-Bid
Less than $535,000 est. value
Fitchburg, WI 53575

2021 Road Work on North Road
Post-Bid
Blue Mounds, WI

Road and General Construction Multiple Award IDIQ for the Chequamegon-Nicolet NF
Results
$5,000 to $7,000,000 est. value

I-39 - Columbus, North Street to School Street
Results
Columbus, WI 53925

Road Work
Post-Bid
Verona, WI

Madison - Cambridge, Whitney Way to IH 39/90
Results
Cambridge, Madison, WI 53558

Road Repairs
Post-Bid
WI 53572

Rockstream Drive Assesssment District - 2020
Results
Less than $2,136,420 est. value
Madison, WI 53719

2021 Road Paving
Post-Bid
McFarland, WI

North Mendota Trail - West Segment Phase B
Results
Middleton, WI 53562

2021 Sealcoating
Renovation
Post-Bid
McFarland, WI

Winnequah Road Bridge Replacement
Results
Monona, WI

Chip Seal Surfacing and Crack Filling of Town Roads
Post-Bid
Roxbury, WI

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

Last Updated 03/14/2022 01:38 AM
Project Title

C. Madison, STH 30, Fair Oaks Avenue, B-13-206; C. Madison, STH 30, Fair Oaks Avenue to IH 39 Ramp

Physical Address View project details and contacts
City, State (County) WI   (Dane County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Dane County; 5490-00-62, WISC 2022 230; 5490-00-63, WISC 2022 231; STH 30; 0.000 Miles; Mill, Grade, Base, Concrete Pavement, Asphalt Pavement, Curb and Gutter, Concrete Barrier, Beam Guard, ITS, Pavement Marking, and Two Structures. Excavation Common, 5,809 CY; Backfill Structure, 75 Ton; Base Aggregate Dense, 6,042 Ton; Base Aggregate Open Graded, 991 Ton; Concrete Pavement, 12,441 SY; Concrete Masonry Bridges, 32 CY; Bar Steel Reinforcement Coated, 5,250 Lbs; Marking Tape, 488 LF; Marking Epoxy, 17,820 LF; Construction Staking, 6,833 LF; Conduit, 200 LF; Concrete Curb and Gutter, 808 LF; Beam Guard, 1,650 LF; Beam Guard Energy Absorbing Terminals, 16 Each; HMA Pavement, 4,143 Ton; Removing Asphaltic Surface Milling, 34,812 SY; Tack Coat, 2,372 Gals; Expansion Device, 35 LF; Concrete Barrier, 364 LF.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.
Division 34 - Transportation, Roadway Construction, Vehicle Barriers, Vehicle Guide Rails.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents