Similar Projects
HVAC System Replacement
Alteration
Post-Bid
East Granby, CT 06026

Terminal HVAC Improvement Project - Bradley International Airport
Renovation
Post-Bid
$3,290,000 CJ est. value
Windsor Locks, CT 06096

330 Windsor Avenue Community Center Gym HVAC Upgrades
Alteration
Results
$200,000 est. value
Windsor, CT 06095

Music Room Air Handling Unit Replacement at Sedgwick Middle School
Alteration
Results
$400,000 est. value
West Hartford, CT 06107

Purchase of Unit Ventilators
Alteration
Post-Bid
Newington, CT

HVAC Renovation Project for the LP Wilson Community Center Phase One
Renovation
Results
$3,865,000 CJ est. value
Windsor, CT 06095

Dehumidifier Unit Replacement at Cornerstone Aquatic Center
Alteration
Post-Bid
$200,000 est. value
West Hartford, CT 06107

Boiler Replacement- CREC Windsor Head Start Interior
Renovation
Results
$975,750 CJ est. value
Windsor, CT 06095

HVAC System Upgrades at Chippens and Hubbell Schools - City of Bristol
Renovation
Post-Bid
$8,500,000 CJ est. value
Bristol, CT 06010

Farmington High School and FPS Central Office Projects - Bid Package 2.23b Rebid
Renovation
Results
$1,259,500 CJ est. value
Farmington, CT 06032

Full or Partial Replacement of HVAC System
Renovation
Post-Bid
$350,000 CJ est. value
Rocky Hill, CT 06067

East Farms School - Cafeteria HVAC Renovation
Renovation
Results
$77,900 CJ est. value
Farmington, CT 06032

Fire Station 3 HVAC Replacement
Renovation
Post-Bid
$200,000 CJ est. value
Rocky Hill, CT 06067

Request for Proposal For Cafeteria Air Conditioning At the Union Elementary School
Renovation
Results
$53,000 CJ est. value
Farmington, CT 06085

On Call HVAC Maintenance Services
Term Contract
Post-Bid
Bristol, CT 06010

Last Updated 01/06/2024 03:33 AM
Project Title

Boiler Room Repairs Slab Replacement Project

Physical Address View project details and contacts
City, State (County) Hartford, CT 06106   (Hartford County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected February 2024
Bids Due View project details and contacts
Estimated Value $60,000 [brand] Estimate
Plans Available from Structural Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The Project Manager is the authorized representative for the State of Connecticut Judicial Branch. Project Manager to act in matters involving revoking, altering, enlarging or relaxing any requirement of the contract documents. The Project Manager will process all requests for information, interpretations and decisions regarding the meaning and intent of the Contract Documents, consulting with appropriate parties prior to rendering the interpretations or decisions for the Owner to the Contractor. All such requests and replies shall be in writing. ALL work is to be substantially completed and ready within 45 calendar days Project scope includes but is not limited to the following: 1. INSTALLATION OF NEW SUPPORT FOOTINGS. 2. ERECTION OF NEW SUPPORT STEEL. 3. CONSTRUCTION OF A NEW CONCRETE FLOOR ON METAL DECK. 4. REMOVAL OF EXISTING SHORING. 5. CORING THROUGH SLAB FOR NEW UTILITIES. 6. CONSTRUCTION OF TEMPORARY PROTECTION OVER EXISTING WATER AND GAS LINES LOCATED OUTSIDE THE BOILER ROOM. 7. REMOVAL OF TEMPORARY CONSTRUCTION FENCE TO BE RETURNED TO THE STATE. 8. REMOVAL OF ANY TEMPORARY DUST PROOF PARTITIONS. 9. Refer to the Contract Drawing package entitled Boiler Room Repairs, as prepared by Macchi Engineers, LLC for more specific information and details on project.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents