Similar Projects
Fuel Stations - Districtwide
Bidding
$550,000 est. value
Brackettville, TX 78832

Chlorine Dioxide and Clarifier Improvements
Bidding
$270,000 est. value
Granite Shoals, TX 78654

Fuel Tank Replacement at East and West Transportation Centers
Post-Bid
Less than $3,539,500 est. value
Katy, TX

Gas Line Extension
Post-Bid
Farmers Branch, TX 75234

Pump House Above Ground Tanks Installation
Results
$498,745 est. value
Grand Prairie, TX 75051

Installation of AST System
Results
$435,650 est. value
Terrell, TX

S212--CTX Fuel Tank Services
Bidding
Temple, Waco, TX

Preventative Fuel Tank Maintanence
Post-Bid
Atlanta, TX 75551

Precast Fuel Storage Tanks
Results
Angleton, TX

Fuel Tanks, N Tyler Mnt and S Tyler AEM
Bidding
$81,000 est. value
Tyler, TX 75708

Fuel Tank Replacement
Post-Bid
Houston, TX 77072

Compressed Natural Gas (CNG) Upgrade Facility & Related Work (Pp-21812971)
Results
Less than $300,000 est. value
San Antonio, TX 78249

Removal of Underground Fuel Storage Tanks and Installation of Above Ground Fuel Storage Tanks
Post-Bid
Longview, TX 75602

Z--Suspended Solids Drumfilter for Catfish Facility
Results
Burnet, TX 78611

Hydropneumatic Tank Replacements
Post-Bid
Conroe, TX 77385

Reported 09/22/2020 12:00 AM
Project Title

Station Port Aransas - Fuel Farm Reconfiguration

Physical Address View project details and contacts
City, State (County) Port Aransas, TX 78373   (Nueces County)
Category(s) Sewer and Water
Sub-Category(s) Fuel/Chemical Tanks and Lines
Contracting Method Competitive Bids.
Project Status Request for Quotations
Bids Due View project details and contacts
Estimated Value
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The contractor will perform the following: a. Isolate, remove, and drain fuel in piping being replaced b. Disconnect and remove solenoid valve c. Remove, drain, and discard the ground mounted fuel filtration unit d. Install new piping and pipe fittings e. Cut and rethread piping as necessary f. Replace galvanized pipe with stainless steel pipe g. Install two new water separators / filters for pump stations h. Remove existing relief valve and install new relief valve i. Reconnect solenoid valve j. Plug old vent lines The contractor will comply with all established security policies at Station Port Aransas. Due to periods of heightened security that may affect the access to the areas covered under this contract, areas may be subject to periodic closures, which in turn may reduce or inhibit the Contractor’s ability to access certain areas. During periods of heightened security, the Government reserves the right, at any time, to close any property or portion of property and reschedule and/or cancel any subsequent service in an area. The Contractor shall be given at least 24 hour notice of any such closure. Containers for excess and/ or waste materials, rubbish, etc. shall be provided by the contractor at the site, and the site will be inspected/ cleaned on a daily basis. Water, air and land resources shall not be adversely impacted during the course of the work. Contractor will take necessary steps to ensure all federal, state, and local environmental regulatory requirements are met. The contractor is responsible for providing all materials to complete the project. Unless specified in the contract, the Government will not provide any equipment, telephone services or other resources. The contractor may use the restroom at the station but must proceed directly to and from the restroom. The contractor will be responsible for providing spill prevention materials including PPE, sorbents, and clean-up item. All spills will be cleaned up immediately. All spills shall be reported to the Technical Point of Contact immediately. Contractor will use best practices to prevent spills or leakage of any hazardous material. Contractor will take immediate action to contain or minimize any spill or leak. The contractor shall furnish all labor, materials, and equipment to reconfigure the fuel farm to full working order and design functionality. The contractor will install and plumb new fuel lines into the gasoline and diesel storage tanks. The tanks are double walled 1,000 gallon gasoline and 4,000 gallon diesel. Both tanks are above ground with no known leaks.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents